11
SERVICE WORK ON THE CHASSIS
11.12
Removing the lower triple clamp
Main work
–
Open the cable holder in front of the right radiator and detach the wiring harness.
–
Remove screws
–
Release screw
handlebar and set it aside.
Info
Protect the motorcycle and its attachments against damage by covering
them.
Do not bend the cables and lines.
S00047-10
–
Remove O-ring
–
Take out the lower triple clamp with the steering stem.
–
Take out the upper steering head bearing.
101329-10
(EXC-F SIX DAYS)
x
Preparatory work
–
Remove the headlight mask with the headlight. (
–
Raise the motorcycle with the lift stand. (
–
Remove the front wheel.
–
Remove the fork legs. (
–
Remove the front fender. (
–
Remove the handlebar cushion.
Main work
–
Open the cable holder in front of the right radiator and detach the wiring harness.
–
Remove screws
–
Remove screw
dlebar and set it aside.
Info
Protect the motorcycle and its attachments against damage by covering
them.
Do not bend the cables and lines.
B01228-10
–
Remove O-ring
–
Take out the lower triple clamp with the steering stem.
–
Take out the upper steering head bearing.
B01229-10
and hang the voltage regulator to one side.
1
and remove screw
. Take off the upper triple clamp with the
2
3
. Remove protective ring
4
(
p. 78)
x
p. 46)
p. 54)
and hang the voltage regulator to the side.
1
. Remove screw
, take off the upper triple clamp with the han-
2
3
. Remove protective ring
4
.
5
p. 87)
p. 45)
.
5
49