Days) - KTM 350 EXC-F EU 2013 Owner's Manual

Hide thumbs Also See for 350 EXC-F EU 2013:
Table of Contents

Advertisement

11
SERVICE WORK ON THE CHASSIS
11.14
Installing the lower triple clamp
(EXC-F SIX DAYS)
x
Main work
Clean the bearing and sealing elements, check for damage, and grease.
High viscosity grease (
Insert the lower triple clamp with the steering stem. Mount the upper steering head
bearing.
Check whether the top steering head seal
Slide on protective ring
B01218-10
Position the upper triple clamp with the steering.
Mount screw
Position the clutch line, wiring harness, and voltage regulator. Mount and tighten
screws
.
5
Guideline
Remaining screws, chassis
B01230-10
Position the fork legs.
Info
The rebound damping is located in the right fork leg (red adjusting screw).
The compression damping is located in the left fork leg (white adjusting
screw).
Grooves are milled into the side of the upper end of the fork legs. The sec-
ond milled groove (from the top) must be flush with the top edge of the
upper triple clamp.
Position bleeder screws
B01231-10
Tighten screws
Guideline
Screw, bottom triple clamp
B01227-12
Tighten screw
Guideline
Screw, top steering head
B01232-10
p. 116)
and O-ring
.
2
3
but do not tighten yet.
4
toward the front.
6
.
7
.
4
is correctly positioned.
1
M6
10 Nm (7.4 lbf ft)
M8
12 Nm (8.9 lbf ft)
M20x1.5
12 Nm (8.9 lbf ft)
52

Advertisement

Table of Contents
loading

Table of Contents