Texas Instruments ADC14X250EVM User Manual

Texas Instruments ADC14X250EVM User Manual

Evaluation module

Advertisement

Quick Links

This user's guide describes the characteristics, operation, and use of the ADC14X250EVM Evaluation
Module (EVM). This document includes a quick-start guide, directions for optimizing evaluation results, a
description of the software, alternate hardware configurations, and jumper, connector, and LED
descriptions.
......................................................................................................................
1
2
3
4
Software Description
5
Alternate Hardware Configurations
6
Jumper, Connector, and LED Descriptions
1
EVM Feature Locations
2
Quick Start Test Setup
3
HSDC Pro GUI Main Panel
4
Data Capture Results from Quick Start Procedure
5
6
1
Quick Start Performance Measurements
2
Troubleshooting Tips
3
HSDC Pro Options for Optimal Analysis Results
4
ADC14X250 GUI Tab Descriptions
5
6
7
8
9
Microsoft, Windows are registered trademarks of Microsoft Corporation.
SLAU625 - November 2015
Submit Documentation Feedback
All manuals and user guides at all-guides.com
ADC14X250EVM Evaluation Module
............................................................................................................
............................................................................................
......................................................................................................
......................................................................................
.............................................................................
List of Figures
.....................................................................................................
......................................................................................................
.................................................................................................
.....................................................................................................
.......................................................................................................
List of Tables
.................................................................................
........................................................................................................
......................................................................................
..................................................................................................
.............................................................................
..............................................................................
....................................................................................................
...........................................................................................................
Copyright © 2015, Texas Instruments Incorporated
Contents
......................................................................
......................................................................
ADC14X250EVM Evaluation Module
User's Guide
SLAU625 - November 2015
2
4
10
11
13
14
3
5
7
8
11
12
8
9
10
11
12
13
14
14
14
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ADC14X250EVM and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Texas Instruments ADC14X250EVM

  • Page 1: Table Of Contents

    SLAU625 – November 2015 ADC14X250EVM Evaluation Module This user's guide describes the characteristics, operation, and use of the ADC14X250EVM Evaluation Module (EVM). This document includes a quick-start guide, directions for optimizing evaluation results, a description of the software, alternate hardware configurations, and jumper, connector, and LED descriptions.
  • Page 2: Overview

    JESD204B data capture card and the High Speed Data Converter Pro (HSDCPro) software tool for high- speed data converter evaluation. The ADC14X250EVM is also compatible with many of the development kits from leading FPGA vendors that contain an FMC connector.
  • Page 3 All manuals and user guides at all-guides.com Overview www.ti.com Required Software The following software is required to operate the ADC14X250EVM and available online. See the References section for links. • ADC14X250_GUI_Installer.zip The following software is required to operate the TSW14J56EVM and available online. See the Section 1.4...
  • Page 4: Quick Start Guide

    TSW14J56EVM to the computer for the first time. 2.1.1 ADC14X250 GUI Installation The ADC14X250 GUI is used to control the ADC14X250EVM. It must be used to properly configured the devices on the EVM: 1. Download the GUI from the TI website. The Section 1.4...
  • Page 5 Quick Start Guide www.ti.com Hardware Setup Procedure A typical test setup using the ADC14X250EVM and TSW14J56EVM is shown in Figure 2. This is the test setup used for the quick-start procedure. The rest of this section describes the hardware setup steps.
  • Page 6 ADC14X250 GUI Configuration Configure the GUI using the following steps: 1. Open the ADC14X250 GUI by going to Start Menu → All Programs → Texas Instruments ADCs → ADC14X250 GUI 2. Verify that the green USB status indicator is lit in the top right corner of the GUI 3.
  • Page 7 2.3.2 HSDC Pro GUI Configuration Configure the HSDC Pro GUI using the following steps: 1. Open High Speed Data Converter Pro by going to Start Menu → All Programs → Texas Instruments → High Speed Data Converter Pro. Figure 3 illustrates the GUI main page.
  • Page 8 Figure 4. Data Capture Results from Quick Start Procedure Table 1. Quick Start Performance Measurements Result Measured Value Unit >70.0 dBFS SFDR >85 dBFS ADC14X250EVM Evaluation Module SLAU625 – November 2015 Submit Documentation Feedback Copyright © 2015, Texas Instruments Incorporated...
  • Page 9 Verify that bandpass filters are used in the clock and input signal paths and that low-noise signal sources are used. Verify that an attenuator is in the signal path at the EVM VIN– input connector. SLAU625 – November 2015 ADC14X250EVM Evaluation Module Submit Documentation Feedback Copyright © 2015, Texas Instruments Incorporated...
  • Page 10: Optimizing Evaluation Results

    The sampling clock provided to the ADC must have very low noise to achieve optimal results. By default, the ADC14X250EVM is configured to require a device clock from an external signal source via the CLK SMA connector to allow for the best possible measured performance.
  • Page 11: Adc14X250Evm Gui

    Allows write and read access to all device registers and bits. Also allows loading and saving of configuration files. The device configurations can be saved from this tab for use in the user’s system. SLAU625 – November 2015 ADC14X250EVM Evaluation Module Submit Documentation Feedback Copyright © 2015, Texas Instruments Incorporated...
  • Page 12: Low Level View Tab

    Perform a generic read or write command to the device shown in the ‘Block’ drop-down box using the Register Buttons Address and Write Data information Figure 6. Low Level View Tab ADC14X250EVM Evaluation Module SLAU625 – November 2015 Submit Documentation Feedback Copyright © 2015, Texas Instruments Incorporated...
  • Page 13: Recommended Lmk04828 Configurations

    PLL2. Reference must be provided at CLKin1 input or on-board XO at Y1/Y2. On-board VCXO at Mode (PLL1 + PLL2) Y3 is also required. SLAU625 – November 2015 ADC14X250EVM Evaluation Module Submit Documentation Feedback Copyright © 2015, Texas Instruments Incorporated...
  • Page 14: Jumper Descriptions And Default Settings

    The EVM LEDs are described in Table Table 9. LED Descriptions Description SYNC Indicates status of JESD204B link OFF: JESD204B link is not established ON: JESD204B link is established ADC14X250EVM Evaluation Module SLAU625 – November 2015 Submit Documentation Feedback Copyright © 2015, Texas Instruments Incorporated...
  • Page 15 All manuals and user guides at all-guides.com STANDARD TERMS AND CONDITIONS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, or documentation (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms and conditions set forth herein. Acceptance of the EVM is expressly subject to the following terms and conditions.
  • Page 16 All manuals and user guides at all-guides.com FCC Interference Statement for Class B EVM devices NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation.
  • Page 17 All manuals and user guides at all-guides.com 【無線電波を送信する製品の開発キットをお使いになる際の注意事項】 開発キットの中には技術基準適合証明を受けて いないものがあります。 技術適合証明を受けていないもののご使用に際しては、電波法遵守のため、以下のいずれかの 措置を取っていただく必要がありますのでご注意ください。 1. 電波法施行規則第6条第1項第1号に基づく平成18年3月28日総務省告示第173号で定められた電波暗室等の試験設備でご使用 いただく。 2. 実験局の免許を取得後ご使用いただく。 3. 技術基準適合証明を取得後ご使用いただく。 なお、本製品は、上記の「ご使用にあたっての注意」を譲渡先、移転先に通知しない限り、譲渡、移転できないものとします。 上記を遵守頂けない場合は、電波法の罰則が適用される可能性があることをご留意ください。 日本テキサス・イ ンスツルメンツ株式会社 東京都新宿区西新宿6丁目24番1号 西新宿三井ビル 3.3.3 Notice for EVMs for Power Line Communication: Please see http://www.tij.co.jp/lsds/ti_ja/general/eStore/notice_02.page 電力線搬送波通信についての開発キットをお使いになる際の注意事項については、次のところをご覧くださ い。http://www.tij.co.jp/lsds/ti_ja/general/eStore/notice_02.page SPACER EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS.
  • Page 18 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2015, Texas Instruments Incorporated...
  • Page 19 IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, enhancements, improvements and other changes to its semiconductor products and services per JESD46, latest issue, and to discontinue any product or service per JESD48, latest issue.

Table of Contents