Zoeller E611 Owner's Manual
Zoeller E611 Owner's Manual

Zoeller E611 Owner's Manual

Submersible non-clog units
Hide thumbs Also See for E611:
Table of Contents
  • Table of Contents
  • Instructions de Sécurité
  • Garantie Limitée
  • Données de Performance
  • Information Avant L'installation
  • Données Électriques
  • Installation Normale D'assèchement
  • Installation Normale pour Eaux Usées
  • Instructions de Branchement de Pompe
  • Fonctionnement
  • Entretien
  • Liste de Vérifications pour L'entretien

Advertisement

Available languages

Available languages

Quick Links

Product information presented
here reflects conditions at time
of publication. Consult factory
regarding discrepancies or
inconsistencies.
Register your
Zoeller Pump Company
Product on our website:
http://reg.zoellerpumps.com/
NOTICE TO INSTALLER: Instructions must remain with installation.
600 SERIES SUBMERSIBLE NON-CLOG UNITS
Congratulations on the purchase of the Zoeller Pump Company 600
Series submersible pump. Since 1939 the name Zoeller has represented
the standard for submersible dewatering and sewage pumps. The same
high quality workmanship and easy maintenance design has been
incorporated into this line of heavy-duty solids-handling submersible
sewage pumps. This Zoeller Pump Company pump will provide years
of trouble-free service when installed according to the manufacturers'
recommendations.
Table of Contents
Safety Instructions ........................................................................ 1
Limited Warranty ........................................................................... 2
Performance Data.......................................................................... 2
Preinstallation Information..........................................................3
Electrical Data ............................................................................... 3
Typical Dewatering Installation .................................................4
Typical Sewage Installation ......................................................4
Pump Wiring Instructions ........................................................ 5-6
Operation..................................................................................... 6-7
Maintenance .................................................................................. 7
Service Checklist .......................................................................... 8
Owner's Information
Model Number: _______________ Date Code: _______________
Serial Number: Pump 1_____________ Pump 2_____________
 Simplex  Panel P/N ______________________________
 Duplex  Rail System P/N ________________________
Job Name: ____________________________________________
Distributor: ____________________________________________
Sales Order Number: ____________________________________
Contractor: ____________________________________________
Date of Installation: _____________________________________
System Readings During Operation: Voltage _____ Amps _____
MAIL TO: P.O. BOX 16347 • Louisville, KY 40256-0347
SHIP TO: 3649 Cane Run Road • Louisville, KY 40211-1961
Tel: (502) 778-2731 • 1 (800) 928-PUMP
OWNER'S MANUAL
© Copyright 2023 Zoeller
This manual incorporates the installation, operation, maintenance,
and service instructions into one document to aid in the ownership of
a Zoeller Pump Company submersible non-clog wastewater product.
Please read and review this manual before installing the product.
Follow the steps and procedures listed on FM0990 for a proper start-up.
Many items contained within, when followed correctly, will not only
ensure a long and problem-free life for the pump, but also save time
and money during installation. Reference FM1799 for repair manual
on 600 Series pumps. Should further assistance be necessary please
call our Product Support Department at 1-800-928-PUMP (7867).
Safety Instructions
TO AVOID SERIOUS OR FATAL PERSONAL INJURY OR MAJOR
PROPERTY DAMAGE, READ AND FOLLOW ALL SAFETY
INSTRUCTIONS IN THIS MANUAL AND ON THE PUMP.
THIS MANUAL IS INTENDED TO ASSIST IN THE INSTALLATION
AND OPERATION OF THIS UNIT AND MUST BE KEPT WITH
THE PUMP.
This is a SAFETY ALERT SYMBOL.
When you see this symbol on the pump or in the
manual, look for one of the following signal words
and be alert to the potential for personal injury or
property damage.
Warns of hazards that WILL cause serious personal
injury, death or major property damage.
Warns of hazards that CAN cause serious personal
injury, death or major property damage.
Warns of hazards that CAN cause personal injury or
property damage.
CAUTION
INDICATES SPECIAL INSTRUCTIONS WHICH ARE
VERY IMPORTANT AND MUST BE FOLLOWED.
THOROUGHLY REVIEW ALL INSTRUCTIONS AND WARNINGS
PRIOR TO PERFORMING ANY WORK ON THIS PUMP.
MAINTAIN ALL SAFETY DECALS.
REFER TO WARRANTY ON PAGE 2.
Co. All rights reserved.
®
FM1798
0123
Supersedes
0721
Visit our website:
zoellerpumps.com
F A M I LY O W N E D
AMERICAN
PROUD

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the E611 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Zoeller E611

  • Page 1 NOTICE TO INSTALLER: Instructions must remain with installation. 600 SERIES SUBMERSIBLE NON-CLOG UNITS Congratulations on the purchase of the Zoeller Pump Company 600 This manual incorporates the installation, operation, maintenance, Series submersible pump. Since 1939 the name Zoeller has represented and service instructions into one document to aid in the ownership of the standard for submersible dewatering and sewage pumps.
  • Page 2 Start-up Technician in the presence of the installing contractor. A copy of this report will be on file at the Zoeller Pump Company offices in Louisville, KY. Failure to comply with the requirement could void the warranty agreement. Refer to page 7 for pumps that are kept in short term storage.
  • Page 3 1750 23.0 J661 7-1/2 1750 25.3 17.9 18.3 83.0 F661 7-1/2 1750 22.0 15.0 15.7 72.0 G661 7-1/2 1750 11.0 36.0 BA661 7-1/2 1750 29.0 *Consult Factory. **Obsolete as of 1/2023 © Copyright 2023 Zoeller Co. All rights reserved. ®...
  • Page 4 (14) Install ring and cable for lifting pump from pit. (15) Basin must be clean and free of debris after installation. (16) Cords must be properly sealed to prevent moisture and gases from entering the control panel. ZEPA0071 © Copyright 2023 Zoeller Co. All rights reserved. ®...
  • Page 5 Oil in the motor housing and lower seal cavity must be checked when pump is serviced. If oil from the motor housing contains water or other contaminations, both seals should be replaced during maintenance. Always replace with new factory recommended oil and service parts. All warranty repairs must be made by Zoeller Authorized Service Stations. CONTROL PANELS These pumps are nonautomatic.
  • Page 6 All single phase models require start capacitor, run capacitor and relay in the circuit to start and operate properly. These components can be purchased separately or prewired in Zoeller Pump Company control panel. For components purchased separately used the diagram for installation and hookup.
  • Page 7 • Inspect power cables for damage or wear. Replace immediately if damage electrical code and all applicable local codes and ordinances. or wear is detected. • Inspect impeller for damage or wear. Replace as required by a Zoeller Authorized LUBRICATION PROCEDURES Service and Warranty Center.
  • Page 8 If the above check list does not uncover the problem, consult the factory - Do not attempt to service or otherwise disassemble pump. These are the original installation instructions. © Copyright 2023 Zoeller Co. All rights reserved. ®...
  • Page 9 SERIE 600 UNIDADES SUMERGIBLES QUE NO SE OBSTRUYE Enhorabuena por la compra de una bomba sumergible al propietario de un producto sumergible de aguas residuales Zoeller trituradora Zoeller Pump Company. Desde 1939, el nombre Zoeller Pump Company. Lea y revise este manual antes de instalar el producto.
  • Page 10 (FM0990). El informe debe ser realizado por un técnico de puestas en marcha aprobado en presencia del contratista de instalación. En las oficinas de Zoeller Pump Company en Louisville, KY se guardará una copia de este informe. La falta de cumplimiento de los requisitos puede anular el contrato de garantía.
  • Page 11 1750 25.3 17.9 18.3 83.0 F661 7-1/2 1750 22.0 15.0 15.7 72.0 G661 7-1/2 1750 11.0 36.0 BA661 7-1/2 1750 29.0 * Consulte con la fábrica. **Obsolete as of 1/2023 © Copyright 2023 Zoeller Co. Todos los derechos reservados. ®...
  • Page 12 (15) El contenedor deberá estar limpio y libre de desechos después de la instalación (16) Los cables deben estar sellados adecuadamente para evitar que la humedad y los gases entren en el panel de control. ZEPA0071 © Copyright 2023 Zoeller Co. Todos los derechos reservados. ®...
  • Page 13 Siempre reemplace con nuevas piezas de servicio y aceite recomendados de fábrica. Todas las reparaciones en garantía deben ser realizadas por Centros de servicio autorizados Zoeller. PANELES DE CONTROL Estas bombas son no automáticas.
  • Page 14 Todos los modelos monofásicos requieren de un circuito con condensador de arranque, condensador de marcha y regulador para poder arrancar y funcionar debidamente. Estos componentes se pueden comprar por separado o precablearse en el panel de control de Zoeller Pump Company. Para componentes comprados por separado use el diagrama de instalación y conexión.
  • Page 15 Una vez terminada la prueba preliminar, el sistema estará listo para ponerse guardarla como se indicó anteriormente. en marcha. Zoeller Pump Company requiere que se llene un Reporte de Paneles: El panel debería tener todas las aberturas selladas para evitar la arranque (ZM1074S) siempre que un sistema se ponga en funcionamiento entrada de humedad y polvo a la caja.
  • Page 16 Si esta lista no le ayuda a identificar el problema, consulte al fabricante - No intente reparar ni desarmar la bomba. Esta es una traducción de las instrucciones de instalación originales. © Copyright 2023 Zoeller Co. Todos los derechos reservados.
  • Page 17: Table Of Contents

    à la pompe mais aussi réaliser des économies de de grande qualité et est facile à entretenir. La pompe Zoeller Pump Company va vous offrir des années de tranquillité si vous suivez les temps et d’argent au moment de l’installation.
  • Page 18: Garantie Limitée

    à d’autres produits abrasifs ou corrosifs, serviettes ou produits d’hygiène Toute installation d’une pompe de la série 600 de Zoeller doit être accompagnée d’un rapport de mise en marche Zoeller Pump Company (FM0990) complété. Ce rapport doit être rempli par un technicien de mise en marche autorisé en présence du contracteur d’installation. Une copie de ce rapport sera conservée aux bureaux de Zoeller Pump Company à...
  • Page 19: Information Avant L'installation

    1 750 25,3 17,9 18,3 83,0 F661 7-1/2 1 750 22,0 15,0 15,7 72,0 G661 7-1/2 1 750 11,0 36,0 BA661 7-1/2 1 750 29,0 *Consulter l'usine **Obsolete as of 1/2023 © Copyright 2023 Zoeller Co. Tous droits réservés. ®...
  • Page 20: Installation Normale D'assèchement

    (15) La cuve doit être propre et exempte de tout débris après l'installation. (16) Les cordons doivent être scellés pour empêcher l’humidité et les gaz de pénétrer dans le panneau de commande. ZEPA0071 © Copyright 2023 Zoeller Co. Tous droits réservés. ®...
  • Page 21: Instructions De Branchement De Pompe

    être remplacés lors de l’entretien. Toujours les remplacer avec l’huile et les pièces de rechange recom- mandés par l’usine. Toutes les réparations sous garantie doivent être effectuées par un centre d’entretien autorisé de Zoeller.
  • Page 22: Fonctionnement

    Tous les modèles monophasés nécessitent un condensateur de démarrage, un condensateur de fonctionnement et un relai dans le circuit afin de démarrer et de fonctionner correctement. Ces composantes peuvent être achetées séparément ou être incluses dans le panneau de commande Zoeller Pump Company. Suivre le schéma de câblage pour l'installation et le branchement des composantes achetées séparément.
  • Page 23: Entretien

    Pompes : Si la fosse reste sèche, alors la pompe peut rester dans la fosse. Lorsque prêt à être utilisé. Zoeller demande un Rapport de mise en route (ZM1074_Fa) la pompe est dans la fosse, il est nécessaire de la faire fonctionner complet lorsque le système est démarré...
  • Page 24: Liste De Vérifications Pour L'entretien

    Si les vérifications ci-dessus ne résolvent le problème, consulter l’usine. Ne pas essayer de réparer ou de démonter la pompe. Il s'agit ici d'une traduction des instructions d'origine. © Copyright 2023 Zoeller Co. Tous droits réservés. ®...

Table of Contents