7
|
Unit installation
Installer reference guide
80
X 1 A
3
X 1 4 Y
4
3 Remove the switch box cover.
4×
T25
4 If necessary, remove the front plate. This is, for example, necessary in the
following cases:
▪
"7.2.5 To lower the switch box on the indoor
"7.4.4 To connect the drain hose to the
▪
▪ When you need access to the high voltage switch box
2×
T25
5 If you need access to the high voltage components, remove the high voltage
switch box cover.
4
unit" [
81]
4
drain" [
87]
ERLA11~16D + EBVH16SU23D
4P655196-1A – 2022.05
Daikin Altherma 3 R F