Danfoss iC7 Series Installation Manual page 15

In-bottom/out-top cooling kit for fa09-fa10, frequency converters
Hide thumbs Also See for iC7 Series:
Table of Contents

Advertisement

In-bottom/Out-top Cooling Kit for FA09-FA10
Installation Guide
1.
Collapse the top duct and position it over the vent in the top of the frequency converter.
2.
Secure the duct to the top of the frequency converter with 4 M5x18 screws.
3.
Extend the telescopic duct upward until the upper flange of the duct is positioned against the underside of the cabinet top
plate.
4.
Secure the duct to the top plate with 6 M5x10 screws (T25) through the upper flange of the duct.
Torque fasteners to 2.3 Nm (20 in-lb).
1
2
3
Illustration 13: Installation of the Top Duct
1
M5x10 screw
2
Telescopic top duct
Danfoss A/S © 2022.03
3
M5x18 screw
4
Upper flange of duct
AN371942791357en-000101 / 136R0254 | 15
Installation
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

176f4038176f4039

Table of Contents