Preparation Of The Machine; Activation Of The Machine; Water Supply - LAVAZZA WEGA EP 4100 BM Use And Maintenance Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 62
E S P R E S S O
P O I N T
3.

PREPARATION OF THE MACHINE

The preparation of the machine and its installation must be carried out by qualified personnel.
The coffee machine on a stable base suitable for a comfortable and correct use of the appliance.
For the machine to operate correctly it must be positioned on a perfectly horizontal surface. Any corrections in machine alignment
must be made by ad usting the feet.
se of the machine ithout all the installation operations having been carried out b technical
personnel could damage it seriousl .
4.

ACTIVATION OF THE MACHINE

4.1

WATER SUPPLY

Filling the internal tank
Turn the key and open the door (A);
fill the tank
(B)
with potable water;
close the door and lock it.
nl pour fresh drin ing ater into the tan not
66
english
espresso coffee machine - user instructions
A
B
.
C

Advertisement

Table of Contents
loading

Table of Contents