Wall Mounting Frame Assembly; Pre-Piping The System - Benchmark ZWB 7-29 CC1 Installation And Servicing

Table of Contents

Advertisement

3.5

Wall mounting frame assembly

B Take the wall mounting frame out of the package and
screw together with 6 screws as shown in fig. 7. Use
the inner lugs on the top and bottom horizontal sec-
tions for the appliances that are 440 mm wide.
Fig. 7
B Hold the wall-mounting frame against the wall ensur-
ing that it is vertical.
B Mark the position of the flue duct hole if a rear flue is
to be used. Refer to fig. 1 and 16.
B Mark the holes for the wall mounting frame onto the
wall, drill and plug the holes and screw the wall
mounting frame to the wall with the screws provided.
Fig. 8
6 720 610 599 GB (03.02)
B Screw the pre-plumbing manifold with two screws to
the wall mounting frame.
Fig. 9
3.6
6 720 610 576-04.1O
Fig. 10 Manifold
43
47
112
171
172
B A drain tap should be fitted at the lowest point of the
central heating system.
6 720 610 576-05.1O
B WRAS approved filling loop must be fitted.

Pre-piping the system

200
171
112
43
50
120-130
260
CH flow
CH return
Gas cock
Domestic hot water
Cold water relief
Installation
6 720 610 576-11.1O
172
47
35
6 720 610 576-06.1O
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

47 108 05

Table of Contents