Pkm IN 5-FZ Instruction Manual page 37

Table of Contents

Advertisement

Available languages

Available languages

suitable for being built-in) must be completely open, unblocked and free of any
kind of dirt.
2. Installation
2.1 Unpacking and positioning
1. Unpack the appliance carefully. Dispose of the packaging as described in
chapter
WASTE MANAGEMENT
2. The appliance may be equipped with a the transport-protection. Be very careful
and do not use any aggressive or abrasive detergents to remove residuals of the
transport-protection.
3. Check that the appliance and the power cord are not damaged.
4. Connect the appliance to a dedicated socket only.
5. Do not install the appliance in a place where it may come in contact with water
or rain; otherwise the insulation of the electrical system will be damaged.
6. Connect the appliance to the mains properly.
2.2 Installation
Selection of installation equipment
Cut out the installation hole as described on the drawing below. For installation
and use, a minimum of 50 mm space shall be preserved around the hole. The
thickness of the work top should be at least 30 mm. Choose heat-resistant materials
for the work top only to avoid any deformation caused by the heat-radiation of the
appliance.
.
37
1. seal

Advertisement

Table of Contents
loading

This manual is also suitable for:

23112

Table of Contents