9.2.8.1
9.2.8.2
9.2.9
n
0311720_SUF_120-500_III_UKUK_V2.0 , 2017-08-01
Switching legionella prevention on and off
To switch legionella prevention on or off, select:
•
[
]: ANTI LEGIONELLA
•
Select NO to switch legionella prevention off.
•
Select YES to switch legionella prevention on. The following screen appears:
•
Select START to activate the period currently displayed.
The following display appears. This display indicates that legionella prevention is
switched on.
Changing legionella prevention start time
If you wish to change the start time, select:
•
[
]: ANTI LEGIONELLA | YES | Change
The following display appears.
•
Now set the day and time the same way as described for setting an extra period in
the week menu (see section 4.3.9). In this case however, the pump will be
automatically started.
•
Select START to start.
Setting the central heating configuration
Use this menu to specify whether a central heating system is connected to the installation.
Note
This function is not yet available.
•
[
]: SETTINGS HEATING.
83