Pump - Riello 976 T Installation, Use And Maintenance Instructions

Gas oil/ kerosene burners
Table of Contents

Advertisement

6.3

Pump

In case of use with gas oil containing up to 10%
Bio blend, it will be essential to use flexible oil
lines suitable for bio fuel use.
Please contact Riello for further information.
WARNING
RL 34 MZ - PUMP SUNTEC ANV 57 CK
RL 44 MZ - PUMP SUNTEC ANV 67 CK
Key (Fig. 20)
1 - Suction line
2 - Return line
3 - Gauge connection
4 - Vacuometer connection
5 - Pressure adjustment screw
6.3.1
Technical data
A - Min. delivery rate at 12 bar gas oil pressure
B - Delivery pressure range
C - Max. suction depression
D - Viscosity range
E - Fuel max. temperature
F - Max. suction and return pressure
G - Pressure calibration in the factory
H - Filter mesh width
ANV 57 CK
A
kg/h
B
bar
C
bar
D
cSt
E
°C
F
bar
G
bar
H
mm
Hydraulic system
D602
Fig. 20
G 1/4"
G 1/4"
G 1/8"
G 1/8"
ANV 67 CK
45
63
7 - 15
7 - 15
0.45
0.45
1 - 12
1 - 12
60
60
2
2
12
12
0.15
0.15
6.3.2
Pump priming
Before starting the burner, make sure that the
tank return line is not clogged.
Obstructions in the line could cause the seal-
WARNING
ing organ located on the pump shaft to break.
(The pump leaves the factory with the by-pass
closed).
In order for self-priming to take place, one of the screws 3)
(Fig. 20) of the pump must be loosened in order to bleed off
the air contained in the suction line.
Start the burner by closing the control devices and with switch
1)(Fig. 21) in the "ON" position. The pump must rotate in the
direction of the arrow marked on the cover.
The pump can be considered to be primed when the gas oil
starts coming out of the screw 3).
Stop the burner: switch 1)(Fig. 21) set to "OFF" and tighten
the screw 3).
Burner
Off
On
The time required for this operation depends upon the diameter
and length of the suction tubing.
If the pump fails to prime at the first starting of the burner and the
burner locks out, wait approx. 15 seconds, reset the burner, and
then repeat the starting operation as often as required.
And so on. After 5 or 6 starting operations allow 2 or 3 minutes
for the transformer to cool.
Do not illuminate the photocell or the burner will lock out; the
burner should lock out anyway about 10 seconds after it starts.
The a.m. operation is possible because the pump
is already full of fuel when it leaves the factory. If
the pump has been drained, fill it with fuel through
the opening on the vacuum meter prior to starting;
WARNING
otherwise, the pump will seize.
Whenever the length of the suction piping ex-
ceeds 20-30 meters, the supply line must be filled
using a separate pump.
Tab. I
21
GB
1
2
Stage
st
1
nd
2
D469
Fig. 21
6420

Advertisement

Table of Contents
loading

Table of Contents