Daikin Altherma 3 H HT W EPRA14DAV3 Installer's Reference Manual page 206

Hide thumbs Also See for Altherma 3 H HT W EPRA14DAV3:
Table of Contents

Advertisement

10
|
Configuration
Energy metering
Installer reference guide
206
BBR16 activation
#
[9.9.F]
[7-07]
BBR16 power limit
#
[9.9.G]
[N/A]
Energy metering
If energy metering is performed by the use of external power meters, configure the
settings as described below. Select the pulse frequency output of each power
meter in accordance with the power meter specifications. It is possible to connect
up to 2 power meters with different pulse frequencies. If only 1 or no power meter
is used, select 'None' to indicate the corresponding pulse input is NOT used.
#
Code
[9.A.1]
[D‑08]
[9.A.2]
[D‑09]
Code
BBR16 activation:
0: disabled
1: enabled
Code
BBR16 power limit: This setting can only
be modified via the menu structure.
0 kW~25 kW, step 0.1 kW
Electricity meter 1:
0 None: NOT installed
1 1/10kWh: Installed
2 1/kWh: Installed
3 10/kWh: Installed
4 100/kWh: Installed
5 1000/kWh: Installed
Electricity meter 2:
0 None: NOT installed
1 1/10kWh: Installed
2 1/kWh: Installed
3 10/kWh: Installed
4 100/kWh: Installed
5 1000/kWh: Installed
In case of pulse meter for photovoltaic panels:
6 100/kWh for PV panel: Installed
7 1000/kWh for PV panel: Installed
Description
Description
Description
EPRA14~18DAV3+W1 + ETBH/X16EF6V+9W
Daikin Altherma 3 H HT W
4P644736-1 – 2021.02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents