10 Commissioning

10.1 Overview: Commissioning

10.2 Precautions when commissioning

10.3 Checklist before commissioning

RXP20~35N5V1B+ARXP20~35N5V1B
R32 split series
4P519439-22V – 2022.10
This chapter describes what you have to do and know to commission the system
after it is installed.
Typical workflow
Commissioning typically consists of the following stages:
1
Checking the "Checklist before commissioning".
2
Performing a test run for the system.
DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING/SCALDING
CAUTION
Do NOT perform the test operation while working on the indoor units.
When performing the test operation, NOT ONLY the outdoor unit, but the connected
indoor unit will operate as well. Working on an indoor unit while performing a test
operation is dangerous.
CAUTION
Do NOT insert fingers, rods or other objects into the air inlet or outlet. Do NOT
remove the fan guard. When the fan is rotating at high speed, it will cause injury.
NOTICE
Turn ON the power 6 hours before operation in order to have power running to the
crankcase heater and to protect the compressor.
During test operation, the outdoor unit and the indoor units will start up. Make
sure that the preparations of all indoor units are finished (field piping, electrical
wiring, air purge, ...). See installation manual of the indoor units for details.
1 After the installation of the unit, check the items listed below.
2 Close the unit.
3 Power up the unit.
The indoor unit is properly mounted.
10
Commissioning
|
Installer reference guide
51

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rxp20n5v1bRxp35n5v1bArxp20n5v1bArxp25n5v1bArxp35n5v1b

Table of Contents