Finishing The Outdoor Unit Installation; To Finish The Outdoor Unit Installation; To Close The Outdoor Unit - Daikin RXP25N5V1B Installer's Reference Manual

Hide thumbs Also See for RXP25N5V1B:
Table of Contents

Advertisement

9
|

Finishing the outdoor unit installation

9 Finishing the outdoor unit installation

9.1 To finish the outdoor unit installation

9.2 To close the outdoor unit

Installer reference guide
50
NOTICE
It is recommended that the refrigerant piping between indoor and outdoor unit is
installed in a ducting or the refrigerant piping is wrapped with finishing tape.
1 Insulate and fix the refrigerant piping and cables as follows:
d
c
a
b
g
a Gas pipe
b Gas pipe insulation
c Interconnection cable
d Field wiring (if applicable)
e Liquid pipe
f Liquid pipe insulation
g Finishing tape
2 Install the service cover.
NOTICE
When closing the outdoor unit cover, make sure that the tightening torque does NOT
exceed 1.3 N•m.
e
f
1
1
2
RXP20~35N5V1B+ARXP20~35N5V1B
R32 split series
4P519439-22V – 2022.10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rxp20n5v1bRxp35n5v1bArxp20n5v1bArxp25n5v1bArxp35n5v1b

Table of Contents