Precautions When Mounting The Outdoor Unit; To Provide The Installation Structure; To Install The Outdoor Unit - Daikin RXP25N5V1B Installer's Reference Manual

Hide thumbs Also See for RXP25N5V1B:
Table of Contents

Advertisement

6
|
Unit installation

6.3.2 Precautions when mounting the outdoor unit

6.3.3 To provide the installation structure

6.3.4 To install the outdoor unit

Installer reference guide
30
INFORMATION
Also read the precautions and requirements in the following chapters:
General safety precautions
Preparation
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
Prepare 4 sets of M8 or M10 anchor bolts, nuts and washers (field supply).
(mm)
a 100 mm above expected level of snow
4× M8/M10
RXP20~35N5V1B+ARXP20~35N5V1B
R32 split series
4P519439-22V – 2022.10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rxp20n5v1bRxp35n5v1bArxp20n5v1bArxp25n5v1bArxp35n5v1b

Table of Contents