JLG 0300203771 Operation & Maintenance Instructions Manual page 31

Table of Contents

Advertisement

Type
Pre-Start Inspection
Before using each day; or
whenever there's an Operator change.
Pre-Delivery Inspection (See
Before each sale, lease, or rental delivery.
Note)
Frequent Inspection
In service for 3 months or 150 hours, whichever comes first;
(See Note)
or
Out of service for a period of more than 3 months; or
Purchased used.
Annual Machine Inspection
Annually, no later than 13 months from the date of prior
(See Note)
inspection.
Preventative Maintenance
At intervals as specified in the Service and Maintenance
Manual.
NOTE: Inspection forms are available from JLG. Use the Service and Maintenance Manual to perform inspections.
3121670
SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
Table 2-1. Inspection and Maintenance Table
Frequency
Primary
Responsibility
Qualification
User or Operator
User or Operator
Owner, Dealer, or User
Qualified JLG Mechanic
Owner, Dealer, or User
Qualified JLG Mechanic
Owner, Dealer, or User
Factory Trained
Service Technician
(Recommended)
Owner, Dealer, or User
Qualified JLG Mechanic
Service
Reference
Operator and Safety Manual
Service and Maintenance Manual
and applicable JLG inspection form
Service and Maintenance Manual
and applicable JLG inspection form
Service and Maintenance Manual
and applicable JLG inspection form
Service and Maintenance Manual
2-3

Advertisement

Table of Contents
loading

Table of Contents