Huawei UPS5000-H-400K-NT User Manual page 8

100 kva power module
Hide thumbs Also See for UPS5000-H-400K-NT:
Table of Contents

Advertisement

UPS5000-H-(400 kVA-800 kVA)
User Manual (100 kVA Power Module)
Contents
4.6.3 800K, Three-Phase Three-Wire................................................................................................................................... 147
4.6.3.1 Top Cable Routing + Rear Air Exhaust Configuration..................................................................................... 147
4.6.3.2 Bottom Cable Routing + Rear Air Exhaust Configuration............................................................................. 152
4.6.3.3 Top Cable Routing + Top Air Exhaust Configuration.......................................................................................158
4.7 Installing Inductor Cabinet PSUs...................................................................................................................................172
4.8 Installing a Top Protection Component...................................................................................................................... 173
4.8.1 400K/500K/600K..............................................................................................................................................................173
4.9 Installing Cables.................................................................................................................................................................. 175
4.9.1 Cable Routing Requirements...................................................................................................................................... 175
4.9.2 400K-600K, Three-Phase Four-Wire......................................................................................................................... 176
4.9.2.1 Top Cable Routing....................................................................................................................................................... 176
4.9.2.2 Bottom Cable Routing............................................................................................................................................... 180
4.9.3 800K, Three-Phase Four-Wire..................................................................................................................................... 185
4.9.3.1 Top Cable Routing....................................................................................................................................................... 186
4.9.3.2 Bottom Cable Routing............................................................................................................................................... 189
4.9.4 800K, Three-Phase Three-Wire................................................................................................................................... 193
4.9.4.1 Top Cable Routing....................................................................................................................................................... 193
4.9.4.2 Bottom Cable Routing............................................................................................................................................... 199
4.10 Installing a Top Enclosure Frame............................................................................................................................... 205
4.10.1 Bottom Cable Routing (400K-600K, Three-Phase Four-Wire)...................................................................... 205
4.10.2 Bottom Cable Routing (800K, Three-Phase Four-Wire).................................................................................. 207
4.10.3 Bottom Cable Routing (800K, Three-Phase Three-Wire)................................................................................208
4.11 Installing Optional Components................................................................................................................................. 210
4.11.1 Installing Cables for the TN-C System.................................................................................................................. 210
4.11.1.1 400K-600K................................................................................................................................................................... 210
4.11.2 Connecting a Remote EPO Switch.......................................................................................................................... 211
4.11.3 Installing an Ambient T/H Sensor...........................................................................................................................212
4.11.4 Installing a Dry Contact Extended Card................................................................................................................213
4.11.5 Installing a Backfeed Protection Card................................................................................................................... 214
4.11.5.1 Cable Routing............................................................................................................................................................. 215
4.11.5.2 Installation and Cable Connection...................................................................................................................... 215
4.11.6 Installing Parallel Cables............................................................................................................................................ 218
4.12 Verifying the Installation............................................................................................................................................... 220
4.13 Sealing Cabinets............................................................................................................................................................... 221
5 Single UPS Commissioning............................................................................................... 223
5.1 Powering On and Starting the UPS..............................................................................................................................223
5.1.1 Power-On........................................................................................................................................................................... 223
5.1.2 Initial Startup.................................................................................................................................................................... 224
Issue 07 (2023-03-20)
Copyright © Huawei Digital Power Technologies Co., Ltd.
vii

Advertisement

Table of Contents
loading

Table of Contents