Tools/Additional Items Required - enphase IQ System Controller 3 Quick Install Manual

Hide thumbs Also See for IQ System Controller 3:
Table of Contents

Advertisement

Tools/additional
items required
S . N O
I T E M N A M E
1
CT-200-CLAMP
2
EP200G-HNDL-R1 (lifting handle)
3
Breakers, different ratings
4
Conduits (with fittings and fitting tools)
5
Drill
6
5/32" pilot bit
7
Screwdriver
8
Wrench
9
Adjustable wrench
10
Torque wrench
11
Level
12
5/32" Allen key
13
Conductor stripper
14
Electrician's hole saw (2") or punch set
15
Stud finder (if required)
16
Conduit ground hub rings
#10,1/4" or 5/16" lag bolts or screw 3" long (depending
17
on attaching wall) for each wall-mount bracket
18
Control wire
* Enphase SKU for control cable: CTRL-SC3-NA-01
IQ System Controller 3/3G Quick Install Guide
Q U A N T I T Y
S O U R C E
3
IQ Combiner/Enphase Store 
1
Enphase Store
4
Enphase Store/retail outlets
As required
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
As required
Provided by installer
As required
Distribution/Enphase Store*
11

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IQ System Controller 3 and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF