Tools/additional
items required
S . N O
I T E M N A M E
1
CT-200-SPLIT
2
EP200G-HNDL-R1 (lifting handle)
3
Breakers, different ratings
4
Conduits (with fittings and fitting tools)
5
Drill
6
5/32" pilot bit
7
Screwdriver
8
Wrench
9
Adjustable wrench
10
Torque wrench
11
Level
12
5/32" Allen key
13
Conductor stripper
14
Electrician's hole saw (2") or punch set
15
Stud finder (if required)
16
Conduit ground hub rings
#10, 1/4" or 5/16" lag bolts or screw 3" long (depending
17
on attaching wall) - for each wall-mount bracket
*2 Eaton BR240B, 1 Eaton BR260, and 3 Eaton BR220 included with EP200G-SC2-RSD-BRK-KIT.
IQ System Controller 2 Quick Install Guide
Q U A N T I T Y
S O U R C E
2
IQ Combiner/Enphase Store
1
Enphase Store
4
Enphase Store/retail outlets *
As required
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
1
Provided by installer
3
Provided by installer
8
Need help?
Do you have a question about the IQ System Controller 2 and is the answer not in the manual?
Questions and answers