Installation Examples - ProMinent Pneumados PNDb Series Operating Instructions Manual

Metering pump
Table of Contents

Advertisement

Assembly / Installation
Stainless steel connection
Connection of
PE/PTFE lines to
stainless steel valves
Order no. 359365
Order no. 359366
Order no. 359368
Suction line
Bypass hose line

Installation examples

Pneumados PNDb
Suction height in WS
Page 14
• For stainless steel pipe connections, place union nut and clamping ring onto the pipe and let
protrude approx. 10mm.
• Push the pipe into the valve up to the stop.
• Tighten the union nut at first fingertight.
• In case of first assembly, then tighten the union nut 1 1/4 turns more
• In case of re-assembly, tighten 1/4 turns more.
• When connecting PE/PTFE lines to stainless steel valves, insert stainless steel support sleeve
into the plastic line in addition.
Support sleeve for hose 6 x 4 mm
Support sleeve for hose 8 x 5 mm
Support sleeve for hose 12 x 9 mm
Cut the free suction line end such that the subsequently installed foot valve is positioned shortly
above the bottom of the tank – for metering solutions with contaminations or sediment at least
50mm above the tank bottom.
IMPORTANT
Always cut the suction line to the required length and route as riser!
For the material type "PV", a vent valve (9) is included. In this case, a hose line with an inner
diameter of 4 – 5mm must be slipped on the bypass hose grommet (10) and the other end of the
hose must be returned to the metering tank; preferably use PVC soft 6 x 4mm.
For PE lines, this is e.g. to be secured against coming lose using an instant cable fastener.
In this case, also connect the pressure line to the pressure connection and the metering valve.
Open the vent valve (9) by turning the star handle anti-clockwise – the way for the coarse suction
ventilation via the bypass is now open.
For liquid ends without vent valve, only connect the pressure line to the liquid end but not to the
metering valve!
9.5
Installation examples
Individual components:
1 Metering pump
2 Metering tank
3 Foot valve with screen and non-return ball
4 Metering valve spring-loaded
5 Pressure-retaining valve type DK (liquid end installation)
6 Pressure-retaining valve type DL (metering line installation)
7 Air chamber / pulsation dampeners
8 Solenoid valve (closed if pump is idle)
9 Discharge valve
10 Vent valve
11 Shut-off device
NOTE
Height (h) x density (δ) ≤ max. suction height in mWC!
1000
1601
6
6
1602
1005
6
5
0708
0413
4
3
0220
2
ProMinent
®

Advertisement

Table of Contents
loading

Table of Contents