Download Print this page

Advertisement

Quick Links

Build Notes
For Model Years 2020 and Later
www.TerraTrike.com | 800.945.9910
Revised 03/2020

Advertisement

loading
Need help?

Need help?

Do you have a question about the Rambler 2020 and is the answer not in the manual?

Questions and answers

Summary of Contents for TerraTrike Rambler 2020

  • Page 1 Build Notes For Model Years 2020 and Later www.TerraTrike.com | 800.945.9910 Revised 03/2020...
  • Page 2 Inflate tires before performing alignment. The Rambler alignment measurement is approximately 30 ½” (center tread to center tread), though slight variance is possible. Most importantly, make sure the alignment remains neutral with a rider seated in the trike. 30½ 30½ www.TerraTrike.com | 800.945.9910...
  • Page 3 9 Rapid Axle Hubmount - RH TT000713 Rapid Axle Hubmount - LH TT000714 Rapid Axle Hubmount - Pair TT000516 10 Rapid Axle - RH TT000717 Rapid Axle - LH TT000718 Rapid Axle - Pair TT000563 11 Axle Spacer TT000568 www.TerraTrike.com | 800.945.9910...
  • Page 4 Hybrid Steering Stack Assembly Continued* Install Axle Spacer (11) between brake rotor and hub. www.TerraTrike.com | 800.945.9910...
  • Page 5 Chain Tube Setup Mount the chain tube assemblies as shown below. Ensure the chain tubes do not rotate in the clamps after tightening the pinch bolts. Top: Bottom: www.TerraTrike.com | 800.945.9910...
  • Page 6: Parts List

    Lower Assy. Chain Tube, 56cm LDPE TT000548 Chain Tube Clamp, Rov/Ram/Mav TT000152 Chain Tube Bracket Arm, M5, M5 TT000640 TT000252 M5 Nyloc Nut SS M5x12mm SHCS SS TT000303 M5x16mm SHCS SS TT000443 M5x18 Pan Head (phillips) SS www.TerraTrike.com | 800.945.9910...
  • Page 7: Chain Routing

    Chain Routing Cable Routing RH Brake Cable Shift Cable www.TerraTrike.com | 800.945.9910...
  • Page 8 Cable Routing LH www.TerraTrike.com | 800.945.9910...
  • Page 9 800.945.9910 | www.TerraTrike.com 4460 40th St. SE | Grand Rapids, MI 49512 USA...