User Interface - Unigas E140X Manual Of Installation - Use - Maintenance

Lmv 2x/3x microprocessor controlled gas burners
Table of Contents

Advertisement

ADJUSTING AIR AND GAS FLOW RATES
WARNING! During commissioning operations, do not let the burner operate with insufficient air flow (danger of
formation of carbon monoxide); if this should happen, make the fuel decrease slowly until the normal combustion
values are achieved.
WARNING! the combustion air excess must be adjusted according to the values in the following chart.
Adjustments - brief description
The air and fuel rates adjustments must be performed at the maximum ouptput first ("high flame"): see the LMV related manual.
Check that the combustion parameters are in the suggested limits.
Check the flow rate measuring it on the counter or, if it was not possible, verifying the combustion head pressure by means of a dif-
ferential pressure gauge, as described on par. "Measuring the gas pressure in the combustion head".
Then, adjust the combustion values by setting the "gas/air" ratio" curvepoints (see the LMV related manual).
Set, now, the low flame output (according to the procedure described on the "Siemens LMV manual") in order to avoid the low
flame output increasing too much or that the flues temperature gets too low to cause condensation in the chimney.
(First) Start-up preliminary operations - gas supply
Recommended actions to be carried out in sequence:
1
Check the burner and all its components are installed correctly
2
Check that all electrical and mechanical parts are connected correctly
3
Check that there is water or other vector fluids in the generator
4
Check that the ventilation gates/dampers in the plant are open and the stack is free
5
Connect the gauges used to adjust and check pressures on the incoming line and on the head, air and fuel side.
6
Open the thermostatic series and the safety chain
7
Turn the main switch on the panel front with the "ON/OFF" selector to position "ON".
8
Check the phase and neutral position is correct
9
Open the manual shut-off valves slowly, in order to prevent any water hammers that might seriously damage valves and pressure
regulator
10 Check the sense of rotation of the electrical motors
11 Bleed the line, getting rid of all the air in the pipe as far as the main gas valve
12 Ensure the pressure entering the main valves is not excessive due to damage to or wrong adjustment of the line pressure regulator
13 Ensure the gas supply minimum pressure is at least equal to the pressure required by the pressure curves - burnt gas flow
DANGER! Venting the air from the piping must take place in safe conditions, avoiding dangerous concentrations
of fuel in the rooms. You must therefore ventilate the rooms and wait long enough for the gases to dissipate out-
side before switching on.
To ensure the proper operation of the flow sensors, the fuel/air pipes must be free of liquid residues such as oil
or water. Also, make sure that the silencer is installed on the air intake.

User interface

The AZL2x.. display is shown below:
Recommended combustion parameters
Recommended (%) CO
Fuel
Natural gas
LPG
Recommended (%) O
2
9 ÷ 10
11 ÷ 12
29
PART III: OPERATION
2
3 ÷ 4.8
2.8 ÷ 4.3

Advertisement

Table of Contents
loading

This manual is also suitable for:

E115xE190x

Table of Contents