HYBRID SOLAR INVERTER SINGLE PHASE
Thank you for selecting and buying V-TAC Product. V-TAC will serve you
the best. Please read these instructions carefully & keep this user manual
handy for future reference. If you have any another query, please contact
our dealer or local vendor from whom you have purchased the product.
They are trained and ready to serve you at the best.
IN CASE OF ANY QUERY/ISSUE WITH THE PRODUCT, PLEASE REACH OUT TO US AT: SUPPORT@V-TAC.EU
FOR MORE PRODUCTS RANGE, INQUIRY PLEASE CONTACT OUR DISTRIBUTOR OR NEAREST
DEALERS. V-TAC EUROPE LTD. BULGARIA, PLOVDIV 4000, BUL.L.KARAVELOW 9B
INSTRUCTION MANUAL
INTRODUCTION
Multi-Language Manual QR CODE
Please scan the QR code to access the manual
in multiple languages.
WEEE Number: 80133970

Advertisement

Table of Contents
loading

Summary of Contents for V-TAC VT-66036103

  • Page 1 Please scan the QR code to access the manual in multiple languages. IN CASE OF ANY QUERY/ISSUE WITH THE PRODUCT, PLEASE REACH OUT TO US AT: SUPPORT@V-TAC.EU FOR MORE PRODUCTS RANGE, INQUIRY PLEASE CONTACT OUR DISTRIBUTOR OR NEAREST DEALERS. V-TAC EUROPE LTD. BULGARIA, PLOVDIV 4000, BUL.L.KARAVELOW 9B...
  • Page 2 WARNING 1. Please make sure to turn off the power before starting the installation. 2. Installation must be performed by a qualified electrician. 3. Prior to the application, please read this section carefully to ensure correct and safe application. Please keep the user manual properly. Surge protection devices (SPDs) for PV installation •...
  • Page 3: Table Of Contents

    Contents 1. Introduction 1.1 Important Safety Instructions 1.2 Explanation of Symbol 1.3 Basic features 1.4 Work Modes 1.5 Dimension 2. Interface definition and Technical Data 2.1 Interface definition 2.2 Technical Data 2.3 Basic Data 2.4 Safety and Protection 3. Installation 3.1 Check for Physical Damage 3.2 Packing List 3.3 Tools required for installation...
  • Page 4: Introduction

    1. Introduction 1.1 Important Safety Instructions Danger! Danger to life due to high voltages in the inverter! All work must be carried out by qualified electrician. The appliance is not to be used by children or persons with reduced physical sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction.
  • Page 5: Explanation Of Symbol

    1.2 Explanation of Symbol This section gives an explanation of all the symbols shown on the inverter and on the type label. Symbols on the Type Label Symbol Explanation CE mark. The inverter complies with the requirements of the applicable CE guidelines.
  • Page 6: Basic Features

    1.3 Basic features Hybrid Inverter series is a high- quality inverter which can convert solar energy to AC energy and store energy into battery. The inverter can be used to optimize self-consumption, store in the battery for future use or feeding to public grid.
  • Page 7: Work Modes

    1.4 Work Modes Hybrid Inverter provides multiple work modes based on different requirements Work modes: Self-use 1.When PV, Grid, Battery is available: A. Solar energy provides power to the loads as first priority, if solar Grid Inverter energy is sufficient to power all connected loads, solar energy excess power will provides to charge battery, and then redundant power will feed to grid.
  • Page 8: Dimension

    Work modes: Bat priority 1. When PV, Grid, Battery is available: A. Solar energy will charge battery as first priority, if solar energy is Grid excess, the excess power will supply load. If there's still some extra Inverter energy, then the excess power will feed the power to grid . B.
  • Page 9: Interface Definition And Technical Data

    2. Interface definition and Technical Data 2.1 Interface definition Object Description Battery +/Battery - PV1+/PV1- PV2+/PV2- DC switch WiFi port for external WiFi Reserved port DRM/BMS Grid current / DRY IO USB port for upgrading POWER CAN /LEAD-NTC Pressure valve EPS output Grid output Note!
  • Page 10: Technical Data

    2.2 Technical Data Model Model VT-66036103 VT-6607103 VT-6606103 R3K6L1 R4K6L1 R5KL1VT DC input Max. recommended DC power [W] 4600 7000 7000 Max. DC voltage[V] Norminal DC operating voltage[V] Nominal DC operating voltage[V] MPPT voltage range [V] 125-500 125-500 125-500 MPPT voltage range@full load [V]...
  • Page 11: Basic Data

    2.3 Basic Data Model VT-6606103 VT-66036103 VT-6607103 Dimension [W/H/D](mm) 550*520*200 Dimension of packing [W/D/H](mm) 680*660*330 Net weight [kg] Gross weight [kg] Installation modularization Operating temperature range[℃] -25~+60 (derating at 45) -25~+60 Storage temperature [℃] 4%~100% (Condensing) Storage/Operation relative humidity <2000...
  • Page 12: Installation

    3. Installation 3.1 Check for Physical Damage Make sure the inverter is intact during transportation. If there is any visible damage,such as cracks, please contact your dealer immediately. 3.2 Packing List Open the package and take out the product, please check the accessories first. The packing list shown as below.
  • Page 13: Mounting

    Mounting Space Requirement Ø 300mm Table Available Space Size Position Min.size 300mm 300mm Left 300mm Right 300mm 300mm Bottom 300mm Front 300mm 300mm Step 1: Screw the wall bracket on the wall 1.1 Place the bracket on the wall and mark down the position of the 4 holes. 1.2 Drill holes with driller, make sure the holes are deep enough (at least 60mm) to support the inverter.
  • Page 14: Electrical Connection

    Other technical requests should comply with the requirement of the local public grid. Table 1 Cable and Micro-breaker recommended Model VT-6607103 (5kW) VT-6607103 (6kW) VT-66036103 (3.6kW) Cable 10-12AWG 10AWG Micro-breaker Micro-breaker should be installed between inverter and grid, any load should not be connected with...
  • Page 15 Step1. Check the grid voltage 1.1 Check the grid voltage and compare with the permissive voltage range (Please refer to technical data). 1.2 Disconnect the circuit board from all the phases and secure against re-connection. Step2. Remove the waterproof lid from the grid port on the inverter. Step3.
  • Page 16: Pv Connection

    <Max. DC input voltage;operating voltage should be conformed to MPPT voltage range. Max.DC Voltage Limitation Model VT-66036103 (3.6 k W) VT-6607103 (5 k W) VT-6606103 (6 k W) Max. DC Voltage (V) MPPT Voltage Range(V)
  • Page 17: Battery Connection

    Step5. Plug the PV connector into the corresponding PV connector on inverter. 4.3 Battery Connection Note Ø 1.Before choosing battery, please note the maximum voltage of battery can not exceed 59V and the rated voltage of battery can not exceed 48V, and the battery communication should be compatible with Hybrid inverter.
  • Page 18: Communication Interface Definition

    tep6. Connect the cable to the terminal of the inverter . S tep7. Assemble waterproof connectors and waterproof covers plate. Step6,7 Note! Positive and negative lines are not allowed to reverse. The positive pole on the left and the negative pole on the right. 4.4 Communication interface definition BMS PIN Definition Ø...
  • Page 19: Wifi And Gprs Connection(Optional)

    4.5 WiFi And GPRS Connection(optional) Inverter provides a WiFi port which can collect data from inverter and transmit it to monitoring-website by WiFi Step1. Plug Wifi into “COM” port at the bottom of the inverter. Step2. Build the connection between the inverter and router. Step3.
  • Page 20: Control Panel

    5. LCD Interface and Setting 5.1 Control Panel Object Description Name Display the information of the inverter. Screen lit in green: The inverter is in grid mode. Off: The inverter is in not in grid mode. lit in green: The inverter is in off-grid mode. Indicator Off: The inverter is in not in off-grid mode.
  • Page 21: Instructions For The Use Of Three Modes

    5.3 Instructions for the use of three modes WORK MODE PEAK SHIFT REMOTE CTRL (Test mode) (Test mode) DC-SOURCE Lithum-48V 14、AUTO TEST (Italian cer tification)
  • Page 22 For example,Before selecting the mode, you can set it up ac cording to the local power grid, PV input mode and battery type. Power grid: Select 1:Set up Press Esc button Press Enter button Circular display User Enter password interface Default password 00000 Press UP/DOWN button Adjust the figure.
  • Page 23: Lcd Interface

    5.4 LCD Interface 5.4.1 Error information Interface Description Numbers represent error codes and text is error information. ERROR NO. Refer to Chapter 9 for specific contents. 02:BatDisconnect NOTE: When there is a lock mark in the upper right corner of the screen, you cannot turn the page, you need to press Enter to 27:BMS Comm.fail unlock it first.
  • Page 24 5.4.6 PV2 Input display interface Interface Description PV2 input real-time voltage, current and power. PV2 INPUT VOLT: 300V CURR: 10.00A POWER: 3000W 5.4.7 DC Voltage interface Interface Description BUS: Real-time voltage of bus capacitor of the machine. DC VOLTAGE LeakCurr: Real-time leak current of the machine. BUS :...
  • Page 25 5.4.11 Grid-connected Interface Description VOLT: Gird real-time voltage. GRID CURR: CT real-time current. VOLT: 0.0V FREQ: Grid real-time frequency. CURR: 0.00A FREQ: 0.00Hz 5.4.12 INV Interface Description VOLT: INV real-time voltage. CURR: INV real-time current. VOLT: 0.0V FREQ: INV real-time frequency. CURR: 0.00A FREQ:...
  • Page 26 5.4.16 Temperature Interface Description INVER: INV Temperature TEMPERATURE DCDC: DCDC Temperature . INVER: 0℃ INSIDE: Internal ambient temperature of the machine. DCDC: 0℃ INSIDE: 0℃ 5.4.17 State Interface Description System information: Display complete machine status STATE information, including: initialization, standby, PV grid connection, grid connection of battery, hybrid power supply, fault, service, self- SYS: STANDBY...
  • Page 27: Settings

    5.5 Settings 5.5.1 State Interface Description SETUP: Press Enter to user settings interface. USER INQUIRE: Query machine model, serial number, software version . 1:SETUP STATISTIC : View machine run statistics. 2:INQUIRE 3:STATISTIC 5.5.2 SET Password Interface Description Enter the password required for setting. The default password PASSWORD is“00000”.
  • Page 28 5.5.4 System setting 5.5.4.1 System setting Interface Description This interface is used to access system information. SYS SETTING Press Up/Down button to move corresponding options. 1: WORK MODE Press Enter to enter the selected menu. 2: EPS ENABLE Press ESC button to return to the setting interface. 3: BAT WAKE -UP There are 7 options in total.
  • Page 29 5.5.4.2 EPS enable Interface Description When the Grid and PV are powered off, Enable the battery to EPS ENABLE supply power to the load, default option is enable. 1:DISABLE 2:ENABLE 5.5.4.3 Battery wake-up Interface Description When the battery is low and the battery relay has been WAKE-UP EN disconnected, the inverter will send instructions to the battery forcibly sucking relay by BMS, and the inverter will charge.
  • Page 30 5.5.4.7 Anti Reverse Interface Description Anti Reverse : Whether Inverter isn’t allowed to generate Anti Reverse electricity to the Grid. 1.DISABLE The default option is disabled. It's means inverter allowed to generate electricity to the Grid. 2.ENABLE 5.5.5 BAT SETTING 5.5.5.1 BAT SETTING Interface Description...
  • Page 31 Interface Description This interface is used to set the lead acid battery discharging BAT END VOLT voltage. (The input value ranges from 108 to 600) INPUT: 108.0 Discharge cut-off voltage, as recommended by the battery UNIT: manufacturer. This interface is used to set the lead acid battery Charge BAT OVP protection voltage.
  • Page 32 5.5.7 RUN SETTING 5.5.7.1 RUN SETTING Interface Description This interface is used to select run setting. RUN SETTING Press Up/Down button to move corresponding options; 1.REACT MODE Press E nter button to enter the selected menu. 2.GRID POWER Factory default Settings. Please consult the distributor for modification.
  • Page 33 5.5.7.3 GRID POWER Interface Description The input value is power percent of grid. GRID PERCENT INPUT: 100% 5.5.7.4 DISCHARGE POWER Interface Description The input value is power percent of battery discharge. DISC PERCENT INPUT: 100% 5.5.7.5 PV POWER Interface Description The input value is power percent of PV.
  • Page 34 5.5.7.8 FAC-MIN Interface Description The input value of Grid low frequency. GRID FREQ LOW It effect when grid mode choose custom. INPUT: 57.0 UNIT: 5.5.7.9 FAC-MAX Interface Description The input value of Grid high frequency. GRID FREQ HIGH It effect when grid mode choose custom. INPUT: 63.0 UNIT:...
  • Page 35 5.5.9 485 BAUD RATE 5.5.9.1 BAUD RATE Interface Description This interface is used to select 485 baud rate. SELECT 1.2400 bps 2.4800 bps 3.9600 bps 5.5.10 LANGUAGE 5.5.10.1 LANGUAGE Interface Description This interface is used to select language. LANGUAGE 1.Chinese 2.English 5.5.11 BACKLIGHT 5.5.11.1 BACKLIGHT...
  • Page 36 5.5.13 CLEAR REC 5.5.13.1 Clear history Interface Description This interface is used to clear operation history. DEL REC 1.CANCEL 2.CONFIRM 5.5.14 PASSWORD 5.5.14.1 PASSWORD Interface Description This interface is used to set password. PASSWORD OLD: XXXXX NEW: XXXXX CONFIRM: XXXXX 5.5.15 MAINTENANCE 5.5.15.1 MAINTENANCE Interface...
  • Page 37: Inquire

    5.6 INQUIRE 5.6.1 INQUIRE Interface Description Press Up/Down button to move corresponding options; INQUIRE Press Enter button to jump to the selected menu. 1.INV MODULE Press ESC button to return to other interface. 2.MODULE SN 3.FIRMWARE 4.RECORD 5.DIAGNOSE 5.6.1.1 INV MODULE Interface Description This interface show inverter model..
  • Page 38: Statistic

    5.6.4 RUNNING RECORDS Interface Description This interface show running recodes. REC(01) 02:Batdisconnect 12-25 23:00 DOWN: 5.6.5 DIAGNOSE Interface Description Factory internal use. DIAGNOSE 000000 000000 000000 000000 000000 000000 5.7 STATISTIC 5.7.1 STATISTIC Interface Description This interface show inverter operation statistic. STAT.
  • Page 39: Autotest Fast

    5.8 Autotest Fast Press the Enter button and 1. SETUP default password 00000 ↓ Press the Enter button to start 14. AUTO TEST Testing 59.S1... ↓ Wait Test 59.S1 OK! ↓ Wait Testing 59.S2... ↓ Wait Test 59.S2 OK! ↓ Wait Testing 27.S1...
  • Page 40 Press the up/down button to page ↓ through the test results 27.S1:228V 408ms Press the up/down button to page ↓ through the test results 27.S2:227V 205ms ↓ Press the up/down button to page through the test results 81>.S1 49.9Hz 103ms ↓...
  • Page 41: Fault Diagnosis And Solutions

    6. Fault diagnosis and solutions The inverter is easy to maintain. When you encounter the following problems, please refer to the Solutions below, and contact the local distributor if the problem remains unsolved. The following table lists some of the basic problems that may occur during the actual operation as well as their corresponding basic solutions.
  • Page 42 Fault diagnosis and solutions Grid voltage is abnormal (1) Check if the grid is abnormal. Grid over vol (2) Restart the inverter and wait until it functions normally. (3) Contact customer service if error warning Grid over vol continues. Grid Frequency is (1) Check if the grid is abnormal.
  • Page 43 Fault diagnosis and solutions Battery temperature is (1) Check the ambient temperature near the lower than the allowed battery to see if it meets the specifications. Bat UnderTem p value Communication between (1) Check the cable, crystal, Line sequence. lithium battery and inverter (2) Checking the Battery switch.
  • Page 44 V1.4...