Please scan the QR code to access the manual in multiple languages. IN CASE OF ANY QUERY/ISSUE WITH THE PRODUCT, PLEASE REACH OUT TO US AT: SUPPORT@V-TAC.EU FOR MORE PRODUCTS RANGE, INQUIRY PLEASE CONTACT OUR DISTRIBUTOR OR NEAREST DEALERS. V-TAC EUROPE LTD. BULGARIA, PLOVDIV 4000, BUL.L.KARAVELOW 9B...
Page 2
WARNING 1. Please make sure to turn off the power before starting the installation. 2. Installation must be performed by a qualified electrician. • "Danger" indicates a hazardous situation which, if not avoided, will result in death or serious injury. •...
Page 3
• Prior to the application, please read this section carefully to ensure correct and safe application. Please keep the user manual properly. • Accesories only together with the inverter shipment are recommended here. Otherwise may result in a risk of fire, electric shock, or injury to person. •...
Page 4
• Avoiding the creation of loops in the system. • Spark gap devices are not suitable to be used in DC circuits once conducting, they won't stop conducting until the voltage across their terminals is typically more than 30 volts. •...
Page 5
EXPLANATION OF SYMBOL Symbol Explanation CE mark. The inverter complies with the requirements of the applicable CE guildlines. TUV certified. RCM remark. SAA certification. Beware of hot surface. The inverter can become hot during operation. Avoid contact during operation. Danger of high voltages. Danger to life due to high voltages in the inverter! Danger.
Page 6
This chapter follows the requirements of the European low voltage directives, which contains the safety instructions and conditions of acceptability for the endues system, which you must follow when installing, operating and servicing the unit. If ignored, physical injury or death may follow, or damage may occur to the unit. Read this before you work on the unit.
Page 7
I Version applies to the wiring rules that requires Neutral line of alternative supply must NOT be isolated or switched (applies to wiring rules AS/NZS_3000:2012 for Australia and New Zealand). Note! • Please control the home loads, and make sure it's within the "EPS output rating"...
Page 8
Work modes: Force time use Priority: battery>load>grid(when charging) Priority: load>battery>grid(when discharging) This mode applies the area that has electricity price between peak and valley. User can use off- peak electricity to charge the battery. The charging and discharging time can be set flexibly, and it also allows to choose whether charge from the grid or not.
Reserved port Grid output DRM/BMS Grid output TECHNICAL DATA 1. DC input (apply to version E, I) MODEL VT-66036103 Max. recommended DC power [W] 4600 Max. DC voltage[V] Norminal DC operating voltage[V] MPPT voltage range [V] 125-500 MPPT voltage range@full load [V] 150-500 Max.
Page 10
AC output/input (apply to version E, I) MODEL VT-66036103 AC OUTPUT Norminal AC power[VA] 3000/3600 Max. apparent AC power[VA] 3000/3600 Rated grid voltage(range)[V] 230 (176 to 270) Rated grid frequency[Hz] 50/60 Norminal AC current[A] 13/16 Max.AC current[A] 13/16 Displacement power factor 0.8 leading...0.8 lagging...
Page 11
Efficiency, Safety and Protection (apply to version E,I) MODEL VT-66036103 MPPT efficiency 99.90% Euro efficiency Max. efficiency 97.60% Max. Ba�ery charge efficiency Max. Ba�ery discharge efficiency Safety & Protection Over/under voltage protection DC isolation protection Monitoring ground fault protection Grid protection...
General Data (apply to version E,I) MODEL VT-66036103 Dimension [W/H/D](mm) 550*520*200 Dimension of packing [W/H/D](mm) 665*635*330 Net weight [kg] Gross weight [kg] Operating temperature range[ ℃ ] Installation Wall-mounted Storage temperature [ ℃ ] -25~+60 (derating at 45) -25~+60 Storage/Operation relative humidity...
PACKAGING DESCRIPTION Object Description Inverter Bracket Expansion screws and pan-head screws PV connectors (2*positive, 2*negative) AC terminals PV pin connectors (2*positive, 2*negative) Wifi module (optional) GPRS module (optional) User manual Mounting Installation Precaution VT series inverter is designed for outdoor installation (IP 65). Make sure the installation site meets the following conditions: •...
SPACE REQUIREMENT Table Available Space Size 300mm Position Min.size Left 300mm 300mm 300mm Right 300mm 300mm Bo�om 300mm Front 300mm 300mm TOOLS REQUIRED FOR INSTALLATION Installation tools: crimping pliers for binding post and RJ 45, screwdriver, manual wrench etc Step 1: Screw the wall bracket on the wall 1.Place the bracket on the wall and mark down the position of the 4 holes.
Select PV modules with excellent function and reliable quality. Open-circuit voltage of module arrays connected in series should be <Max. DC input voltage; operating voltage should be conformed to MPPT voltage range. Max.DC Voltage Limitation Model VT-66036103 Max. DC Voltage (V) MPPT Voltage Range (V) 125-500...
Warning! PV module voltage is very high, which already achieve dangerous voltage range, please comply with electric safety rules when connecting. Please do not make PV positive or negative ground! Note! The following requirements of PV modules need to be applied for each input area; Please do not make PV positive or negative ground! In order to save cable and reduce the DC loss, we suggest to install the inverter near PV modules.
BD series inverter are designed for single phase grid. Voltage is 220/230/240V, frequency is 50/60Hz. Other technical requests should comply with the requirement of the local public grid. Table 4 Cable and Micro-breaker recommended MODEL VT-66036103 E VERSION CABLE 4-5 mm² E VERSION MICRO-BREAKER I VERSION CABLE 8-10mm²...
Page 18
Step2. Remove the waterproof lid from the grid port on the inverter. Step3. Make AC wires. 1.Choose the appropriate wire(Cable size: refer to Table 4). 2.Reserve about 60mm of conductor material sectional area. 3.Remove 10mm of insulation from the end of wire. 4.Separate the docking screw cap of the AC terminal from the housing portion.
Page 19
EPS Connection( apply to I Version and E Version only) VT series inverter has On and Off grid function, the inverter will deliver output power through AC port when the grid is on, and it will deliver output power through EPS port when the the grid is off.
Page 21
6.Tighten the docking screw cap and housing portion of the AC terminal. Step2. Connect the AC connector to the EPS port of the inverter and tighten the screw cap. CABLE AND MICRO-BREAKER RECOMMENDED MODEL VT-66036103 EPS Cable ≥ 5mm² EPS Breaker...
BD Hybrid inverter. • Battery breaker Before connecting to battery, please install a nonpolarized DC breaker to make sure inverter can be securely disconnected during maintanance. MODEL VT-66036103 Nominal voltage of DC breaker should be larger than VOLTAGE maximum voltage of ba�ery.
BATTERY CONNECTION DIAGRAM • Charging & discharging system of VT series inverter is designed for high-voltage lithium battery. Before choosing battery, please note the maximum voltage of battery can not exceed 59V and the rated voltage of battery can not exceed 48V, and the battery commu- nication should be compatible with BD Hybrid inverter.
STEP1,2,3 STEP4 STEP5 STEP6, 7 Note: BAT port, not PV port!The positive pole on the left and the negative pole on the right. Note ! Positive and negative lines are not allowed to reverse. METER CONNECTION Meter is used for monitoring the power usage for entire house,at the meantime, inverter will also need the data from Meter to achieve the Export Control Function.
Page 25
Meter connection diagram Meter PIN Definition Communication interface bewteen inverter and meter is RS485 with a RJ45 connector. IGRID_AP_I IGRID_AN_I IGRID_BN_I IGRID_CP_I IGRID_CN_I IGRID_BP_I RS485_A RS485_B Please refer to BMS connection steps (page32) for Meter connection. Please kindly noted the PIN definition and port position will be slightly different. Step1.
Step 3 Dry contact BMS-485 Parallel BMS-CAN Step 4 DRM CONNECTION DRM is provided to support several demand response modes by emitting control signals as below. Note: Only PIN6(DRM0) is available now, and other PIN functions are being devel- oped. DRM1/5 DRM2/6 DRM3/7...
Step 3 Dry contact BMS-485 Parallel BMS-CAN Step 4 WIFI CONNECTION(OPTIONAL) Inverter provides a WiFi port which can collect data from inverter and transmit it to monitoring-website by WiFi.(Purchase the product from supplier if needed) Could Router WIFI CONNECTION STEPS Step1.
GPRS CONNECTION(OPTIONAL) VT series inverter provides a GPRS(radio frequency) interface which control the switch time of a designated load via an exteral Smart Plug (purchase the product from supplier if needed.) so that the load mostly consumes PV energy and incurs the lowest-possible energy costs during operation.
Page 29
Check the inverter: Step1. Check the status of indicators and LCD screen. The indicator screen should display the main interface. Note ! If the left indicator is not blue please check below the three points: -All the connections are correct. -All the external breakers are switched on.
Page 30
SETTING Object Name Description Control Panel LCD SCREEN Display the information of the inverter. lit in green: The inverter is in grid mode. Off: The inverter is in not in grid mode. lit in green: The inverter is in off-grid mode. Indicator Off: The inverter is in not in off-grid mode.
Page 31
Note: If local grid connection requires reactive power, please set the required reactive power according to the following reference. SET ACCORDING TO ACTUAL NEEDS PV INPUT POWER BATTERY PARAMETERS PEAK LOAD SHIFTING After finishing the setting of Peak load shifting mode the charging and discharging time also need to be set up.
1. Select the corresponding mode based on actual situation Self-generation and self-consumption(system default mode) If you want to set up more items, please restart after completing the setup. BATTERY PRIORITY Note: When choosing battery priority mode, the corresponding charging current should be opted for according to the battery type.
Page 33
8.1.2 PV2 input display interface 8.1.3 Bus voltage 8.1.4 Battery 8.1.5 BMS parameters 8.1.6 BMS parameters...
FAULT DIAGNOSIS AND SOLUTIONS The inverter is easy to maintain. When you encounter the following problems, please refer to the Solutions below, and contact the local distributor if the problem remains unsolved. The following table lists some of the basic problems that may occur during the actual operation as well as their corresponding basic solutions.