Transport And Assembly - Steelcase Flex Active Frame Quick Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Unit width
1W
2W
EN

7. Transport and assembly

Check the delivery contents:
After unpacking, check the Flex Active Frames units immediately for damage sustained during transport
and for completeness; inform the manufacturer of any damage as soon as possible.
Assembling Flex Active Frames:
Please follow the provided assembly directions for assembly of the shelves or bridges.
Assembly of the Frame Active Frames always starts with a Base Unit followed by Extension Units.
The accessories are mounted in this sequence:
1. Coat Rod, 2. Fixed Board, 3. Infill Panel and Center Panel, 4. Flap Door, 5. Mobile Board Clips and
Cable Clips, 6. Bookend and ToolBox
The mounting and removal of the Flex Active Frames accessories are described in the assembly
instructions. The assembly instructions are also available online at:
www.steelcase.com > Design Resources > Documents > Assembly Directions > Search: Flex Active Frames
156913
Unit height
Number of shelves
2
2H
3
2
3H
3
4
4H
5H
2
2H
3
2
3H
3
4
2
3
4H
4
5
2
3
5H
4
5
6
F l e x A c t i v e F r a m e s
Number of counterweights
1
0
2
1
1
Caution: Unit is unstable!
0
0
1
0
0
4
4
3
4
4
4
3
2
2
Rev. A

Advertisement

Table of Contents
loading

Table of Contents