Komatsu 830E-1AC Operation & Maintenance Manual page 64

Sound attenuation package
Hide thumbs Also See for 830E-1AC:
Table of Contents

Advertisement

Lubrication & Service - Section 40
Page 40-2
EVERY 500 HOUR INSPECTION
Item
Engine Side Panels
Engine Belly Pan
Radiator Silencer
Rear Engine Compart-
ment Enclosure
Front Panel Assembly
Below Radiator Attenuator
Hood Seals
500 HOUR INSPECTION CHECKS
Inspect panels for damage and repair or replace where necessary.
Inspect door seals for damage or misalignment and repair or replace where
necessary.
Inspect the acoustic insulation and perforated steel covers for damage or soil build-
up and repair or replace where necessary. The acoustic insulation should
completely fill the void and be free of mud and excessive dust build-up. It should be
soft and of consistent density. Replace if necessary.
Inspect door hinges and latches for damage and repair or replace where necessary.
Lubricate when required.
Inspect attenuator splitters for damage or excessive soiling and repair or replace
when necessary.
Inspect all panels for damage and repair or replace where necessary.
Inspect hinges, latches, and grab handles for damage. Repair or replaces where
necessary.
Inspect seals for damage or misalignment. Repair or replace where necessary.
Inspect the acoustic insulation and perforated steel covers for damage or soil build-
up and repair or replace where necessary. The acoustic insulation should
completely fill the void and be free of mud and excessive dust build-up. It should be
soft and of consistent density. Replace if necessary.
Inspect the protective sheathing for damage. If the protective sheathing has been
ripped, torn or is otherwise damaged, it should be replaced.
Inspect radiator attenuator for excess amounts debris, oil, or grease. Remove
debris as required. Wipe oil or grease off with a clean rag as soon as practical.
Inspect panels for damage and repair or replace where necessary.
Inspect rubber flaps and seals for damage or misalignment, repair or replace where
required.
Inspect the insulation and perforated steel covers for damage or soil build-up and
repair or replace where necessary. The acoustic insulation should completely fill the
void and be free of mud and excessive dust build-up. It should be soft and of
consistent density. Replace if necessary.
Inspect panels for damage. Inspect the insulation and perforated steel covers for
damage or soil build-up and repair or replace where necessary.
The acoustic insulation should completely fill the void and be free of mud excessive
dust build-up. It should be soft and of consistent density. Replace if necessary.
Inspect panels for damage and repair or replace where necessary.
Inspect seals for damage or misalignment and repair or replace where necessary.
Inspect the acoustic insulation and perforated steel covers for damage or soil build-
up and repair or replace where necessary. The acoustic insulation should
completely fill the void and be free of mud and excessive dust build-up. It should be
soft and of consistent density. Replace if necessary.
Task
OM4066

Advertisement

Table of Contents
loading

This manual is also suitable for:

A30500

Table of Contents