Set-Up - MAHLE MCX-1 Operation Manual

Multiple coolant exchanger
Table of Contents

Advertisement

The MCX-1 has two tanks (plus an extra New Coolant Tank) which are installed and
connected from the rear. Quick connect couplers are mounted on the hoses which connect
these tanks to the MCX-1. A green hose connects to the small New Coolant Tank and a black
hose connects to the large Waste Tank.
1. Slide the New Coolant Tank to the rear and sit it on the floor.
2. Remove the tank cap and fill the tank with new coolant and water in the proportions
specified by the coolant supplier. The tank can be disconnected and moved to a bulk
storage and fill area if desired. A plug is provided on the cap to prevent spillage during
transport.
3. Replace the tank cap and position the tank in the MCX-1. Make sure the green hose is
securely connected. Slide the tank to the front so the liquid level can be seen through the
front panel slot.
4. Make sure the plug
Make sure the plugs are removed from the caps on
Make sure the plug
Make sure the plug
coolant tank. This is required for venting the tanks during operation.
coolant tank. This is required for venting the tanks during operation.
coolant tank. This is required for venting the tanks during operation.
coolant tank. This is required for venting the tanks during operation.
5. Fasten the clips on the tank strap to secure the tanks in the MCX-1.
SET UP
Green Hose
Black Hose
Green Hose
s are removed from the caps on the waste tank and the new
s are removed from the caps on
s are removed from the caps on
Page 4
New Coolant
Tank Cap & Plug
Quick
Coupler
New Coolant Tank
(Small)
the waste tank and the new
the waste tank and the new
the waste tank and the new

Advertisement

Table of Contents
loading

Table of Contents