Summary of Contents for Crane Barnes EcoTRAN System
Page 1
Read all instructions in this manual before operating pump. As a result of Crane Pumps & Systems, Inc., constant product improvement program, product changes may occur. As such Crane Pumps & Systems reserves the right to change product without prior written notification. A Crane Co. Company...
Page 3
To reduce risk of electrical shock, pumps and control panels must be properly grounded in accordance with IMPORTANT! - Crane Pumps & Systems, Inc. is not the National Electric Code (NEC) or the Canadian responsible for losses, injury, or death resulting from a...
Page 4
Step 21: START UP PRE-CHECKLIST Prior to performing an electrical and hydraulic performance check of the complete station, verify all of the following criteria are met: The shut-off and redundant check valve at force main are installed in the lateral discharge and are in the open position Discharge piping has been pressure tested to 150 PSI max without leakage Inlet has a minimum of 1/8”...
Page 5
Crane Pumps & Systems, Inc. Distributor. RETURNED GOODS RETURN OF MERCHANDISE REQUIRES A “RETURNED GOODS AUTHORIZATION”. CONTACT YOUR LOCAL CRANE PUMPS & SYSTEMS, INC. DISTRIBUTOR. Products Returned Must Be Cleaned, Sanitized, Or Decontaminated As Necessary Prior To Shipment, To Insure That Employees Will Not Be Exposed To Health Hazards In Handling Said Material.
Need help?
Do you have a question about the Barnes EcoTRAN System and is the answer not in the manual?
Questions and answers