Quick Start Guide
00825-0100-3402
Section 2: Installation
2.1
Unpacking and Inspection
Inspect the outside of the carton for any damage. If damage is detected, contact the carrier
immediately. Inspect the instrument and hardware. Make sure all items in the packing list are
2.2
Sensor Installation
Figure 2-1 Sensor orientation
Figure 2-2 Recommended installation
Keep ¼ in. (6 mm) clearance between electrodes and piping. The electrolytes must be completely
submerged in the process liquid, i.e., to the upper edge of the guard (item 10 in
Installation
present and in good condition. Notify the factory if any part is missing.
Installation
May 2019
Figure
2-4).
3