Pre-Installation Checklist - H3C MSR600 Series Installation Manual

Table of Contents

Advertisement

Figure1-2 Installation tools and equipment

Pre-installation checklist

Item
Installation
site
Requirements
Ventilation
Temperature
0°C to 45°C (32°F to 113°F)
Relative
5% RH to 95% RH (noncondensing)
humidity
Dust concentration ≤ 3 × 10
Cleanness
on the tabletop over three days)
ESD prevention
EMI prevention
Lightning
protection
There is a minimum clearance of 100 mm (3.94 in)
around the air inlet and outlet vents.
An adequate ventilation system is available at the
installation site.
4
particles/m
The router and floor are reliably grounded.
The equipment room is dust-controlled.
Humidity and temperature are maintained at
acceptable levels.
Wear an ESD wrist strap or ESD gloves and ESD
clothing when touching a circuit board.
Take measures against interference from the power
grid.
Do not use the grounding equipment of the router
together with the grounding equipment or lightning-
prevention equipment of power equipment, and keep
the router far away from them.
Keep the router far away from high-power radio
launchers, radars, and equipment with high
frequency or high current.
Electromagnetic shielding is used as required.
The router is reliably grounded.
The power receptacle is reliably grounded.
(Optional.) Port lightning protectors are available. A
signal lightning arrester is required at the input end of
an external signal cable.
1-5
Result
3
(no visible dust

Advertisement

Table of Contents
loading

Table of Contents