Page 1
施工说明书 Instructions for construction Before product installation, read these instructions for construction carefully and retain it for future reference. 0G3861Y[A] 2018.03...
Page 12
Contents 生产厂家与销售商 Contents GB 18145-2014 Contents Detailed list Service condition and attentions in (0411) 87624383 construction Attentions in construction and maintenance Combinational installation 800-820-9787 400-820-9787 completion figure Installation completion figure 10-13 Water nozzle installation 14-20 Manufacturer and vendor...
Detailed list Detailed list Detailed list Detailed list Handle part 1 set Handle part 1 set Handle knob part 1 set Decorative plate 1 set Bushing 1 piece Decorative cover 1 piece Decorative plate 1 set Screw 4 pieces Decorative cover 1 piece Instructions for construction 1 copy...
Service condition and attentions in construction Attentions in construction and maintenance Service condition Attentions 1. Cold water supply*hot water supply pressure Minimum pressure ………………… 0.05MPa (flow pressure) 1. As the ceramic spool is a precise component, do not dismantle it without Maximum pressure …………………...
Combinational installation completion figure Combinational installation completion figure Schematic diagram for DP348 and DV309S series water nozzle working with Schematic diagram for DP349 and DV311-2R series water nozzle working with other products of TOTO other products of TOTO 400±5 61.5 400±5...
Page 16
Combinational installation completion figure Combinational installation completion figure Schematic diagram for DP352 and DV309-3R series water nozzle working with Schematic diagram for DP353 and DV311-3R series water nozzle working with other products of TOTO other products of TOTO 300±5 61.5 300±5...
Water nozzle installation Water nozzle installation Preparation before installation:DV309S、DV309-3R Preparation before installation:DV311-2R、DV311-3 1.Cleaning in the water supply pipe Chisel at the burial wall location by referring to the completion figure. Before installation,be sure to remove by washing such foreign matters as dust, sand,etc.in the water supply pipe;in installation,it is imperative to also take care sufficiently not to allow such foreign matters as mud and sand,etc.to enter into the water nozzle or the water supply pipe.
Page 20
Water nozzle installation Water nozzle installation 3.Body installation Decorative plate and handle part installation(1) Connect the cold and hot water pipes and use the fixing ring to fix. DP348 and DV309S water nozzle 4.Water leakage inspection As shown in the figure,install the fixing plate onto the valve body.Then use screws Provide water in the connecting pipe part buried in wall for water leakage to fix the fixing plate onto the wall.Install the fixing sleeve and decorative cover and inspection.
Page 21
Water nozzle installation Water nozzle installation Decorative plate and handle part installation(II) Decorative plate and handle part installation(III) DP352and DV309-3R water nozzle DP349 and DV311-2R water nozzle First install the fixing sleeve onto the valve body.Use the screws removed from the First use the fixing screws to fix the fixing plate onto the valve body.Then install the protective sleeve to fix the fixing plate onto the body.Install the decorative plate.
Production date:See the label on the packaging case when fixing the handle part and valve body O-ring, please pull the decorative plate Assembly factory:TOTO(Dalian)Co.,Ltd. out appropriately.After fixing completely the handle part and O-ring part,then push the decorative plate to fit with the wall surface.) Finally, fix the mounted handle onto Telephone:(0411)87624383 the valve body by using small screws.
Need help?
Do you have a question about the 0G3861Y and is the answer not in the manual?
Questions and answers