Siemens SICHARGE UC Installation And Commissioning Manual page 62

Hide thumbs Also See for SICHARGE UC:
Table of Contents

Advertisement

Table 6- 1
Table 6- 2
Short cantilever arm
Long cantilever arm
No.
5
Before mounting, remove any objects and dirt from the mounting surface
6
Check the threaded rods for damage and dirt. Clean and repair the threaded rods
7
Screw 2 nuts on each threaded rod
① Threaded rod
② Washer
③ Nut
No.
8
Place a washer on the nuts
9
Align the nuts with a level
10
Make sure that the position of the nuts matches the position of the mast planned in the project for
its location
11
Mark the position of the nuts
Lifting the SICHARGE UC MastPanto
No.
1
Fasten the approved sling gear to the connecting rod mounting points or in the center at the mast
end
2
Connect the sling gear to the crane hook
Installation and Commissioning Checklist for SICHARGE UC
Product Information, 03/2023, A5E52548271-AA
Planning measurement table
H
460
4800
510
4750
560
4700
610
4650
660
4600
710
4550
Overview of the dimension F in mm
Checklist item
Checklist item
Checklist item
C
B
3194
3144
3094
3044
2994
2944
2190
2400
2190
2400
④ Lock nut
⑤ Foundation
SICHARGE UC MastPanto
6.2 Installation
B
min
4400
4350
4300
4250
4200
4150
2630
2630
P
P
P
max
3650
F
N/A
F
N/A
F
N/A
61