Construction and approach direction
Approach direction from the left
No.
1
The following figure shows the construction of the contact hood with the approach direction from
the left
①
Approach direction from the left
②
DC- connection
③
PE Ground connection
④
CP connection
⑤
DC+ connection
⑥
Electronics box
Figure 5-1
Contact hood with approach direction from the left
Installation and Commissioning Checklist for SICHARGE UC
Product Information, 03/2023, A5E52548271-AA
Checklist item
SICHARGE UC MastHood
5.1 Pre-Installation
P