Pre-Installation; Work Safely - RadonAway AIRaider 321 Instruction & Installation Manual

Hide thumbs Also See for AIRaider 321:
Table of Contents

Advertisement

1. Pre-Installation

WARNING: FAILURE TO INSTALL AND MAINTAIN THE UNIT ACCORDING
TO THESE INSTRUCTIONS MAY RESULT IN PERSONAL INJURY OR PROPERTY
DAMAGE.
The AIRaider Systems are diffused bubble aeration systems for the removal of radon and other VOCs
from residential and municipal water supplies. This installation/operation manual is designed to
guide professionals through the safe and proper installation of the AIRaider Systems.
Before beginning the installation of the AIRaider System, there are 5 items to be considered.
They are:
1. Safety
2. Installation Site Requirements
3. Inspection of System Components
4. Necessity for Qualified Technicians
5. Knowledge of all Contaminants in the Water
1.1. Safety Matters
Safety is the most important step in the installation process. Never perform any step of the installation
that you are not qualified to perform (i.e. Electrical or plumbing hook up). It is important that you read
through the entire manual prior to beginning the installation. When performing the installation, work
slowly and deliberately. Follow all instructions carefully and never take shortcuts. Our team of
technicians is available to answer your questions at 800-355-0901.
IN063 Rev.E
PRE-INSTALLATION
3 Saber Way, Ward Hill, MA 01835 | radonaway.com

WORK SAFELY!

Page 3 of 26

Advertisement

Table of Contents
loading

This manual is also suitable for:

28424

Table of Contents