2. Installation Instructions
OVERVIEW
Now you are ready to begin the installation process. The nine steps to properly install the AIRaider
System are listed below. Read all components of each step prior to beginning the actual installation.
1. System Location
2. Readying the System for Installation
3. Plumbing Hook-up
4. Electrical Hook-up
5. Mount and Connect ASV Control/Alarm Unit
6. Vent Line Installation
7. Remote Air Intake Installation
8. System Start-up
9. System Check
433-S50
(Repressurization Systems not shown, sold separately on 321, 433 and 433-1)
IN063 Rev.E
INSTALLATION INSTRUCTIONS
SAFETY TIP: Do Not undertake any step for which
you are Not Qualified.
433 & 433-1
Figure 3 a,b,c
Typical System
3 Saber Way, Ward Hill, MA 01835 | radonaway.com
321
Page 7 of 26

Advertisement

Table of Contents
loading

This manual is also suitable for:

28424

Table of Contents