Table of Contents OVERVIEW Before reading the user manual Configuration and Tips of User Manual Package Contents of PRO-7310B6 Package Contents of PRO-7510B4 Part Names and Functions HDD INSTALLATION 11 How to Install HDD 12 How to Attach HDD EXECUTION...
Overview Before reading the user manual Be sure to read the following before reading the user manual. • This manual is copyrighted by the manufacturer. • This manual cannot be reproduced without permission. • We are not responsible for any damage caused by using products other than the standard product or using the product for the purpose other than mentioned in the manual.
Page 5
Checking the Installation Environment This product is a state-of-the-art security equipment with a high capacity hard disk and important circuitry inside. When the temperature inside the product is too high, its life cycle might be shortened, or it might be broken. Therefore, install it so that it is well-ventilated, and refer to the following recommendations before installation.
Overview Configuration and Tips of User Manual The manual of this product is composed as follows. y Quick Guide y SSM User Manual y System User Manual This User Manual is the default setting for user's guide. The User Manual contains the following in order: If you want to apply the modification to the actual operating environment, refer to the SSM User Manual and the System User Manual.
Package Contents of PRO-7310B6 Mouse Power cord Quick Guide HDD mounting screws Hard disk tray label Accessories other than the NVR body are consumables and are excluded from the warranty. All manuals can be downloaded from our homepage (www.hanwha-security.com). Rack mounting brackets for mounting in the server rack are sold separately.
Overview Package Contents of PRO-7510B4 Mouse Power cord DISC 1 DISC 16 Quick Guide HDD mounting screws Hard disk tray label Accessories other than the NVR body are consumables and are excluded from the warranty. All manuals can be downloaded from our homepage (www.hanwha-security.com). Rack mounting brackets for mounting in the server rack are sold separately.
Part Names and Functions Front (PRO-7310B6) Front (PRO-7510B4) Name Power button USB Port Hard disk tray Power and status LEDs...
Page 10
Overview Rear <IO Ports> Name Name Power input USB 3.0 (4 ports) System fan Optical SPDIF output port PS/2 Mouse/Keyboard port Audio IO port VGA port 1000BASE-T RJ-45 (Internal 2 ports) DVI port 1000BASE-T RJ-45 (External 4 ports) HDMI port 10_ Overview...
1. There are many factors inside the product that can cause electric shock, accident, or product failure. So unplug the power and install it. Disconnect both power cords of PRO-7310B6/PRO-7510B4. 2. Remove the hard disk tray from the enclosure. 3. Place the HDD in the hard disk tray so that it aligns with the screw holes on each side.
HDD Installation How to Attach HDD How to remove or attach hard disk tray to/from the enclosure 1. Pull the handle to release the latch, then grasp the handle and pull straight out. 2. Place the other hand under the hard disk tray so that it will not fall when you remove or mount it. ...
Page 13
How to attach HDD to hard disk tray 1. Attach the 3.5” HDD to the hard disk tray using the four screws as shown. 2. Align the 2.5 "HDD with the four holes on the bottom of the hard disk tray as shown and tighten the screws. ...
Page 14
HDD Installation Hard disk tray number Each hard disk tray of the enclosure is numbered as follows. PRO-7310B6 hard disk tray numbers PRO-7510B4 hard disk tray numbers 14_ HDD Installation...
Execution Power Supply Plug all of the power cords into the back of the product, and press the power button. If the product does not turn on, check the following. 1. Make sure that all the power cords have been plugged in firmly, and that they meet the required power specifications.
Execution How to create a logical drive This chapter describes how to configure logical drives. 1. Click the SSM Service Manager icon on the desktop to launch it. 2. After you click the Stop Service button, check if the service status has changed to Stopped, and exit. If the service status is shown as Stopped, just exit.
How to configure advanced logical drives This is a method of configuring a logical drive to maximize the performance of this equipment. 1. To ensure disk availability, select the Spare Drive menu to create a spare drive. 2. From the Create Disk Array menu, choose Advanced Configuration. Disable the Use Media Traversal option in the Create Disk Array menu that appears after selecting, select the number of physical drives, and go to the next step.
Page 18
Execution 3. After selecting and updating the RAID level, go to the next step. • For optimal product performance, we recommend RAID5. • For optimal product performance, select 64 KB for Stripe. • For optimal product performance, select 512 Bytes for Sector. •...
Page 19
6. In Windows Disk Management, check the disks configured for RAID. It is recommended to complete the Virtual Disk configuration for all disks being used before checking. Disks that have not been configured for Virtual Disk will also be displayed in the Disk Management screen. For an optimal recording performance, create a new simple volume only for disks that have been configured for Virtual Disk.
Page 20
Execution 8. Right click on the partition that has not been allocated and select New Simple Volume. 9. Click Next in the New Simple Volume Wizard. 20_ Execution...
Page 21
10. After checking the Simple Volume Size, click Next. The Simple Volume Size may differ depending on the HDD capacity and RAID Level. 11. After checking the drive letter, click Next.
Page 22
Execution 12. After changing the allocation unit size to 256K, click Next. Select 256K for the allocation unit size for optimal product performance. 13. Click Finish to complete the New Simple Volume Wizard. 22_ Execution...
Page 23
14. Check that the disk is recognized normally.
Execution Network settings This chapter explains how to set up a network. 1. Click the SSM Service Manager icon on the main screen to launch it. 2. Move to the network settings. 3. Select the Ethernet IP address configured in the network cards NIC #1 and NIC #2. When the network environment changes, the network card settings will also be changed.
How to create network teaming This section will explain how to configure Teaming to create network redundancy. 1. Connect the NETWORK 2 and NETWORK 3 ports to the network switch and LAN line, respectively. 2. Run Intel® PROSet Adapter Configuration Utility via [Start] All Programs Intel Intel® PROSet Adapter Configuration Utility.
Page 26
Execution 4. Select Create Team. 5. Select the adapters to be included in the team. 26_ Execution...
Page 27
6. Enter a team name and select a type. • Teaming type a. IEEE802.3ad Dynamic Link Aggregation b. Switch Fault Tolerance c. Adapter Fault Tolerance d. Adaptive Load Balancing e. Static Link Aggregation Precautions by Team Type - When using the IEEE802.3ad Dynamic Link Aggregation type, you must use a switch that supports the IEEE 802.3ad Standard.
Page 28
Execution 7. Select the primary and secondary adapters for the team. 8. Check that the team has been configured. • To remove the teaming configuration, click the Remove Team button. 28_ Execution...
Page 29
9. Set an IP for the created team to use it.
3. Select ‘Launch SSM service automatically when Windows starts’ and apply it, then exit 4. Run the SSM console program from the desktop. Alternatively, select [Start] Wisenet SSM Console. 5. On the login screen, click the Login button.
Menu Description The menus in the SSM Console client program consist of tabs. You can freely move on the menu tabs to select the desired menu item. 1. To open a menu page, click the ‘+’ in the upper left corner of the program and select the desired menu. 2.
Page 32
Important Please check ‘Manuals’ from our website, before connecting to the Supply, https://www.hanwha-security.com/en/data-center/download-data/ Warranty Please check “Product warranty information” from our website. https://www.hanwha-security.com/support/warranty/ Hanwha Techwin cares for the environment at all product manufacturing stages, and is taking measures to provide customers with more environmentally friendly products.
Page 33
경기도 성남시 분당구 판교로 319번길 6 (삼평동 701) 영 업 TEL 070-7147-8771~9 A/S 및 기술문의 1588-5772 부산영업소 TEL 051-796-3216 대구영업소 TEL 053-742-3098 광주영업소 TEL 062-941-9559 대전영업소 TEL 042-489-9840 http://www.hanwha-security.com Head Office 6, Pangyo-ro 319 beon-gil, Bundang-gu, Seongnam-si, Gyeonggi-do, 463-400 Rep. of KOREA Tel : +82.70.7147.8753 Fax : +82.31.8018.3740 www.hanwha-security.com Hanwha Techwin America...
Need help?
Do you have a question about the PRO-7310B6 and is the answer not in the manual?
Questions and answers