Outdoor Unit - Carrier 42QFD048D8S Service Manual

Table of Contents

Advertisement

3.2

Outdoor Unit

Evacuation for the whole system
Procedure:
1.
Confirm that the 2- and 3-way valves are opened.
2.
Connect the vacuum pump to the 3-way valve's
service port.
3.
Evacuate the system for approximately one hour.
Confirm that the compound meter indicates
-0.1 MPa (14.5Psi).
4.
Close the valve (Low side) on the charge set and turn
off the vacuum pump.
5.
Wait for 5 minutes then check whether the gauge
needle moves after turning off the vacuum pump. If
the gauge needle moves backward, check whether
there is gas leakage.
6.
Disconnect the charge hose from the vacuum pump.
7.
Mount the caps of service port and 2- and 3-way
valves.
8.
Use a torque wrench to tighten the caps to a torque
of 18 N.m.
Maintenance 7

Advertisement

Table of Contents
loading

This manual is also suitable for:

38qus048d838qus048d8t

Table of Contents