Preparing the server
Preparing the
server for operation
Procedure
Procedure
1. Install any options or cables previously removed to access the TPM connector.
2. Install the access panel .
3. Install the server into the rack .
4. Connect all peripheral cables to the server.
5. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
6. Power up the server .
7. If removed, install the front bezel .
for operation
Preparing the server for operation
157