This is the user's guide for the ADS42B4x EVM (Revision A). The ADS42B49 (dual-channel, 14-bit, up to
250 MSPS) is a dual analog-to-digital converter family. This EVM is specifically suited for interfacing with
TI's TSW1400 EVM to capture and display waveforms from the ADC. The EVM schematic, Bill of
Materials (BOM), and layout files are found in the design package in the ADS42B4x EVM product folder
on www.ti.com.
1
2
3
Optional Configurations
1
ADS42Bxx_GUI Front Panel - Top Level
2
3
Test Set-Up Block Diagram
4
5
6
7
1
Default ADS42Bxx EVM Revision A Jumper Setting for Serial Interface
2
Parallel Interface with Pin Control of ADS58C28 and ADS42Bxx EVM Revision B Jumper Setting
3
4
Jumper Setting for Transformer-Coupled or CDCE72010 Input
5
Jumper and Component Settings for DDR LVDS Output and Parallel CMOS Output
SLAU477A - December 2012 - Revised January 2015
Submit Documentation Feedback
All manuals and user guides at all-guides.com
.............................................................................................................
.......................................................................................................
....................................................................................................
...............................................................................
............................................................................................
................................................................................................
...........................................................................................
...............................................................................................................
Copyright © 2012-2015, Texas Instruments Incorporated
SLAU477A - December 2012 - Revised January 2015
Contents
List of Figures
...............................................................
...............................................................
List of Tables
............................................
......................................................
....................................................
User's Guide
ADS42B4x EVM
.............
............................
ADS42B4x EVM
2
4
10
3
4
5
7
8
9
9
5
6
10
11
11
1
Need help?
Do you have a question about the ADS42B4x EVM and is the answer not in the manual?
Questions and answers