Installation

This section describes installation of the Connect-IWS wireless terminal, PoE power
injector and surge suppression device. The installer will need to complete the following
activities as part of the installation procedure for the Connect-IWS radio.

Installation Steps

4.1 Preparation
1. Review the installation overview
2. Review the Site Survey section to ensure all installation requirements are
complete and all installation materials are available.
3. Assemble antenna with mounting bracket.
4. Connect and weatherproof RF lead-in cables
4. 2 Install Outdoor Equipment
1. Install antenna on Mast
2. Coarse Antenna Alignment
4.3 Install In-Cabinet Equipment
1. Install Connect-IWS
2. Install RF Surge Arrestors
3. Connect and weatherproof antenna lead-in cables
4.4 Configure System Operating Parameters
1. Required Materials
2. Establish Communications with Test PC
3. install Options Key
4. Network and RF settings
5. Medium/Fine antenna Adjustment
70-00200-03-00
Installation Guidelines
Proprietary Redline Communications © 2014
Chapter 4
Page
35
of 62
December 3, 2014

Advertisement

Table of Contents
loading

Related Products for Redline Connect Series

This manual is also suitable for:

Connect-iws

Table of Contents