Palm VIIX Handbook page 99

Palm viix: user guide
Hide thumbs Also See for VIIX:
Table of Contents

Advertisement

Spotting event conflicts
With the ability to define specific start and end times for any event, it's
possible to schedule events that overlap (an event that starts before a
previous event finishes).
An event conflict (time overlap) appears in the Week View as
overlapping bars. The Day View displays overlapping brackets to the
left of the conflicting times.
Working in Month View
The Month View screen shows which days have events scheduled.
Dots and lines in the Month View indicate events, repeating events,
and untimed events.
Month View button
You can control the dots and lines that appear in the Month View. See
"Options menu" at the end of this section on Date Book.
Chapter 4
Event
conflicts
Previous/next month
Dashed line indicates continuous event
Dots on right side indicate events
Dots below date indicate untimed events
Page 91

Advertisement

Table of Contents
loading

This manual is also suitable for:

3c80501u - vllx - os 3.5 20 mhzVii

Table of Contents