Safety Instructions -------------------------------------------------------------------- page 2
Caution Signs and Labels ----------------------------------------------------------- page 5
Technical Specifications ------------------------------------------------------------- page 6
Single Gate Operator Parts List --------------------------------------------------- page 7
Installation of First (Single) Gate Operator ------------------------------------- page 9
Preparing the Gate -------------------------------------------------------------- page 9
Installing the Post Bracket Assembly --------------------------------------- page 10
Connecting Operator to Post Bracket Assembly ------------------------- page 12
Installing the Gate Bracket --------------------------------------------------- page 13
Installing the Open and Closed Position Stops --------------------------- page 14
Installing the Control Box ---------------------------------------------------- page 15
Powering the System ----------------------------------------------------------- page 17
Solar Zones and Gate Activity ----------------------------------------------- page 18
Programming the System ----------------------------------------------------------- page 20
Setting the Personal Transmitter Code ------------------------------------------ page 23
Setting the Limit Switches ---------------------------------------------------------- page 24
Mounting the Receiver -------------------------------------------------------------- page 25
Accessory Hookups ------------------------------------------------------------------ page 26
Installation of Second (Dual) Gate Operator ----------------------------------- page 27
Programming for Dual Gate Installations --------------------------------- page 30
Push-To-Open Instructions -------------------------------------------------------- page 31
Maintenance and Troubleshooting ----------------------------------------------- page 33
Warranty and Repair --------------------------------------------------------------- page 35
Masonry Column Installation Information ------------------------------------- page 36
Accessories ----------------------------------------------------------------------------- page 37
Installation Check List ------------------------------------------------- Inside Back Cover
Read these instructions before beginning the installation to
become familiar with the parts and installation sequence.
Review safety precautions and operator instructions with
the end user and leave installation manual with them for
future reference.
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PRO 2000 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for GTO PRO 2000

  • Page 1: Table Of Contents

    Table of Contents Safety Instructions -------------------------------------------------------------------- page 2 Caution Signs and Labels ----------------------------------------------------------- page 5 Technical Specifications ------------------------------------------------------------- page 6 Single Gate Operator Parts List --------------------------------------------------- page 7 Installation of First (Single) Gate Operator ------------------------------------- page 9 Preparing the Gate -------------------------------------------------------------- page 9 Installing the Post Bracket Assembly --------------------------------------- page 10 Connecting Operator to Post Bracket Assembly ------------------------- page 12 Installing the Gate Bracket --------------------------------------------------- page 13...
  • Page 2: Safety Instructions

    NOTE: GTO Automatic Gate Operators are intended to be part of a total gate operating system. It is the responsibility of the purchaser, designer and installer to insure that the total system is safe for its intended use. The manufacturer is not responsible for accidents arising from unsafe installations or improper use.
  • Page 3 SPECIAL NOTES FOR THE INSTALLER I. Before Installation 1. Check to ensure that this gate operator is proper for the type and size of gate and its frequency of use (see page 6). Make sure that the gate has been properly installed and swings freely while opening and closing. Repair or service any worn or damaged gate hardware prior to installation of operator.
  • Page 4 If you feel you haven’t received full and proper instructions, contact your installer. It is your responsibility to make sure that the installer posted GTO's caution signs on both sides of your gate. If any of these signs or caution decals become damaged, illegible or missing, replace them immediately. Contact your installer or GTO for replacement.
  • Page 5: Caution Signs And Labels

    IMPORTANT!! Caution Signs and Labels The following caution signs and labels are included with this gate operator. If any are missing, contact GTO at 1-800- 543-4283 immediately and we will send replacement signs and/or labels. ® CAUTION AUTOMATIC GATE STAND CLEAR 1-800-543-GATE Caution signs (2) to be placed on both sides of gate to warn pedestrians.
  • Page 6: Technical Specifications

    15 mA. OPERATIONAL CAPACITY • The GTO/PRO 2000 and GTO/PRO 2200 will handle gates weighing up to 1000 lbs. (453 kg) and up to 20 ft. (6.1 m) in length if all proper installation procedures have been followed. Note that ball bearing hinges should be used on all gates weighing over 250 lbs.
  • Page 7: Single Gate Operator Parts List

    Installation of First (Single) Gate Operator Single Gate Operator Parts List Parts Gate Operator with 6 ft. Power Cable Post Pivot Brackets (2) Post Bracket Rear Mount Gate Bracket Closed Position Stop Hardware (not to scale) " x 10" Carriage Bolt (2) "...
  • Page 8 • If the gate is more than 1000' away from an A.C. Power Source you will need to use one or more GTO Solar Panels to provide the trickle charge to the battery. See the Accessory Catalog, page 37. • The diameter of the fence post should be at least 8" (round) or 6" (square) in order to mount the post bracket (see page 10).
  • Page 9: Installation Of First (Single) Gate Operator

    Post Bracket Assembly STAND CLEAR 1-800-543-GATE Control Box with Battery 120 Volt Indoor Transformer Gate Bracket GTO/PRO 2000 (Surge Protector, not supplied) Power Cable Closed Position Positive Stop Plate Run up to 1000' of low voltage wire to control box from transformer.
  • Page 10: Installing The Post Bracket Assembly

    Installing The Post Bracket Assembly The post bracket position determines the leverage of the operator and the clearance between the operator and the 8” Wood Post gate. 6” Wood or Metal Post The post bracket is designed to work on a flat fence post. Fence posts must be at least 6”...
  • Page 11 Step 4: Position the post bracket on the fence post with the mounting holes centered over the scribe line. The post bracket should be flush with the edge of the fence post closest to the gate (see illustration). Mark the position of post bracket holes on the fence post.
  • Page 12: Connecting Operator To Post Bracket Assembly

    Connecting Operator to Post Bracket Assembly Step 7: Tap the rear mount onto the back of the operator. Align the " hole in the rear mount with " hole in the back of the operator and insert the " bolt through the holes and secure it with the lock nut.
  • Page 13: Installing The Gate Bracket

    Step 10: Open the gate to the desired position (at least 10º and no greater than 110º). Position the operator arm so that the gate bracket just rests against the gate. Check the clearance between the operator and the gate. The operator should only make contact with the gate at the gate bracket.
  • Page 14: Installing The Open And Closed Position Stops

    Stability in both the open and closed positions contributes to the long life of the operator and to the durability of the installation. For additional stability and security, install the GTO Automatic Gate Lock (see Accessory Catalog on page 37).
  • Page 15: Installing The Control Box

    Step 15: Hinge point Close the gate. Position the closed position stop plate on the end of the gate frame at mid-height. Extend the stop plate to make contact with the fence post at that position. Closed Position Install the closed position stop plate using appropriate Stop Plate hardware for the type of gate (u-bolts for tube or chain link gate, wood or lag screws for wood gates, etc.).
  • Page 16 Pull 6”-8” of wire into the control box and tighten the strain relief to secure power cable. The free end of the power cable can be cut to length, if necessary. Wrong Wrong Correct 15 amp 15 amp PRO 2000 Board Terminal Blocks Terminal Terminal Terminal Wire Wire Wire...
  • Page 17: Powering The System

    5) The MNC for the GTO/PRO 2000 is roughly comparable to most AC powered operators, and the transformer provided with this operator should handle most high traffic situations. If the battery does not seem to be able to provide the constant charge required for your application, the addition of a deep cycle marine battery should provide ample power to handle any situation.
  • Page 18: Solar Zones And Gate Activity

    Important Information About Low Voltage Wire The only wire recommended for use with GTO products is GTO’s 16 gauge, multi-stranded, low voltage, PVC sheathed wire. This particular gauge will enable the transformer to provide an adequate charge to the control board from as far away as 1000 ft.
  • Page 19 Step 24: Strip 1/4" off the ends of the low voltage wire and twist each wire end tightly. Attach these ends to the control board at the terminal strip marked "TRANSFORMER". Do not let the wire ends touch each other! Insert the RED wire into the RED TRANSFORMER terminal block and the BLACK wire to the BLACK TRANSFORMER terminal block.
  • Page 20: Programming The System

    Programming the System Step 27: Please read these instructions completely before attempting to program the gate operator. All GTO/PRO operators are pre-programmed with the same factory settings for the following features: Type Of Installation: Single gate, pull-to-open; Obstruction Sensitivity: Most sensitive;...
  • Page 21 Feature S3 - Auto Close The Auto-Close feature determines whether or not the gate will close automatically after it is opened, and if so, how long it will remain open before it begins to close. The factory setting (S5) automatically closes the gate 60 seconds after opening.
  • Page 22 PROGRAMMING THE GTO/PRO 2000 & 2200 AUTOMATIC GATE OPERATOR The first button pushed determines the feature. When SETTINGS the LED light stops flashing, you have four seconds to press the second button. The second button pushed determines the setting. Single Gate...
  • Page 23: Setting The Personal Transmitter Code

    Step 28: All GTO transmitters are set to the same code at the factory, and are ready to activate the GTO/PRO operator. For safety and security, however, we strongly recommend that you change the factory setting to the end user’s own personal code, according to the following directions: 1.
  • Page 24: Setting The Limit Switches

    For Pull-to-Open Installations: The open position of the gate was determined when you installed the GTO/PRO 2000 on the open gate (page 13, Step 12). The outer switch cam is used to adjust the closed position of the gate. The ideal closed position is when the closed position stop plate makes contact with the fence post just as the operator motor shuts down.
  • Page 25: Mounting The Receiver

    Step 31: Secure all bolts, nuts, and washers on the post bracket and gate bracket assemblies. Cut off the ends of the bolts extend- ing beyond the tightened nuts. Step 32: Install Caution Signs on both sides of the gate using tywraps (provided) or screws. Mounting the Receiver Step 33: Consider the following points when deciding where to place the receiver:...
  • Page 26: Accessory Hookups

    Tighten set screws against exposed end of wires. A dab of household petroleum jelly on each terminal will help prevent corrosion. WHITE used with GREEN: This is the most commonly used combination for a doorbell button. PRO 2000 Board This is a normally open contact. Terminal Blocks First contact will start the gate.
  • Page 27: Installation Of Second (Dual) Gate Operator

    Installation of Second (Dual) Gate Operator Second Operator Parts List Parts Gate Operator with 50’ Power Cable Rear Mount Post Bracket Post Pivot Brackets (2) Gate Bracket Closed Position Stop Plate Hardware (not to scale) " x 10" Carriage Bolt (2) "...
  • Page 28 FRONT VIEW into ground directly below the gate. The positive stop plate installed in Step D1 should rest against the ground stop in the closed position. For added security, install a GTO Gate Lock (see Accessory Catalog on page 37).
  • Page 29 Attach the strain relief for the second operator power cable to the control box. Then run the second operator power cable into the control box through the strain relief. NEVER splice wires together! 15 amp 15 amp PRO 2000 Board Terminal Blocks FIRST OPERATOR SECOND OPERATOR POWER IN ACCESSORY GTO RECEIVER...
  • Page 30: Programming For Dual Gate Installations

    After completing these dual operator programming steps, return the control board to the Operating Mode as in Step 5 on page 21. PROGRAMMING THE GTO/PRO 2000 & 2200 AUTOMATIC GATE OPERATOR The first button pushed determines the feature. When SETTINGS the LED light stops flashing, you have four seconds to press the second button.
  • Page 31: Push-To-Open Instructions

    (not open) position. Because every gate installation varies, the push-to-open installation of the GTO/PRO 2000 and GTO/PRO 2200 will need to be customized. In most cases this only requires drilling two new holes in the post bracket.
  • Page 32 Step P3: With the gate in the closed position, connect operator to gate bracket assembly as in Step 12 on page 13 and clamp into position. Mark the point where the gate bracket will be attached to the gate. Drill the holes and mount the gate bracket.
  • Page 33: Maintenance And Troubleshooting

    • Spray the push-pull tube with silicone spray about 4 to 12 times a year. • Test all the safety accessories once per month! If they are not working, contact the installer or GTO Inc. Gate sensitivity adjustments regulate the amount of force the operator needs to move the gate. If the hinges are in good working condition, try using the S2 (“...
  • Page 34 Move the receiver as far from the motor as possible to avoid the chance of electrical interference. Check or change the battery in the transmitter. The GTO, Inc. Customer Service Department is open Monday - Thursday 7:30 a.m. - 5:30 p.m.
  • Page 35: Warranty And Repair

    Please retain these records. After the two (2) years warranty period, GTO or one of its authorized service centers will make any neces- sary repairs for a nominal fee. Call GTO at (850)575-0176 for more information.
  • Page 36: Masonry Column Installation Information

    Column Installation Information 12" MAX The GTO/PRO 2000 and GTO/PRO 2200 can be mounted on any size column, but the gate hinge cannot be more than 12” from the mounting surface of the gate bracket. The edge of the gate bracket must be aligned with the edge of the column face where the hinges are mounted.
  • Page 37: Accessories

    Requires 3 AA batteries (not included). Can also accommodate most garage doors and other gate openers. If used as a wired keypad, GTO low voltage, 16 gauge, dual conductor, multi-stranded, direct burial wire will be required.
  • Page 38 A MUST for added security. Driven by a 4 amp solenoid, the plated steel bolt lock has a zinc plated steel housing. The horizontal electronic lock is used with all GTO swing gate operator systems for additional security and stability. Comes with a keyed manual release.
  • Page 39 Replacement Battery (RB500) The standard 12 volt, 7.0 amp-hour, maintenance-free battery for all GTO/PRO gate operators. This battery is the only battery approved for use with GTO Operators. Life expectancy is 3-5 years. Operator Solar Panel (FM123 ) - Improved, Amorphous Silicon (Two Year Warranty*) This 10 watt solar panel is a solar powered battery charger for use with GTO/PRO Automatic Gate Operator systems.
  • Page 41: Installation Check List

    ____ A photo has been taken of completed installation from both front and back of the gate, and dated. ____ Review the Accessory Catalog with the customer/end user. ____ Ask customer/end user to fill out customer support card and mail it to GTO. ____ Ask customer/end user to keep all receipts, installation manuals etc. for future reference.
  • Page 42 GTO/PRO 2000 GTO/PRO 2200 G PERATOR ERIES • S • INGLE AND ATES NSTALLATION ANUAL FOR THE ROFESSIONAL NSTALLER Receiver ® CAUTION AUTOMATIC GATE Post Bracket Assembly STAND CLEAR 1-800-543-GATE Control Box with Battery 120 Volt Indoor Transformer Gate Bracket...