6. System preparation
6.1. Start up of new system
To ensure smooth start-up of the new system, follow
these guidelines.
6.2. Bleeding guidelines
6.2.1. Bleeding the pipe system
•
Close water and air supply after use.
•
Leaving the air supply open may allow air to enter
the water pipe.
•
Regular bleeding may be necessary after pro
longed shutdowns.
6.2.2. Bleeding the pump (MA only)
•
Start the pump to force any remaining air pockets
to the top of the pump.
•
Stop the pump.
•
Loosen the relief plug 1-2 turns again and bleed
until only water flows.
•
Tighten the relief plug.
•
Never loosen the relief plug while the pump is in
operation as this may damage the gasket.
A
DETAIL A
•
The mainstation is now ready for use.
6.3. Adjustments
6.3.1. Instruction and setup
Refer to the user guide for general machine operation
instructions.
Refer to the software manual for guidance on setting
up automatic wash programs and area valves.
18
6.3.2. Adjustment of air
To adjust air, remove the unit cover and set air pres-
sure on the reduction valve for desired foam quality.
When setting the regulator, carefully
pull up the knob and turn it clockwise
for pressure increase and counter clock
wise for pressure decrease.
6.3.3. Adjustment of product - manual block
Adjust product for the manual block by using a limiting
nozzle located in the suction nipple of the non-return
valve (refer to image 110009231).
0627131
•
Remove the unit cover.
•
Replace the nozzle with a smaller or larger one to
adjust concentration. Refer to the table for guid-
ance.
110009226
110009197