Maintenance; Health And Safety - Delta Dual 800 Groundwater Series Installation Manual

Packaged pumping stations
Table of Contents

Advertisement

7. Maintenance

Sump pumps must be maintained. We recommend a qualified engineer examines and services equipment every year. Pumps
running frequently due to higher water table, water drainage, or weather conditions should be examined more frequently, we
recommend every 6 months. Sump pumps, being mechanical devices, may fail if not maintained which could lead to a flooded
basement and costly repairs.
Regular servicing of sump pumps will increase efficiency and extend the life of the pump. All Delta pump systems should be
maintained by one of our Delta Registered Pump Service Providers or installing contractor.
8. Health and safety
In order to minimise the risk of ill health or accidents when installing and/or servicing pump chambers, workers must be fully
trained, competent and follow the health and safety guidelines below:
Do not work without a risk assessment being in place.
Work in accordance with the control measures identified in the risk assessment.
All personnel must be vaccinated against diseases to which they may be exposed to, i.e. Tetanus, Polio, Hepatitis A&B, etc.
At the time of writing, due to there being no vaccine against leptospirosis/Weil's disease, where rats may be present,
ensure appropriate personal protective equipment (skin protection) is worn and ensure any cuts or abrasions are fully
covered.
There should be no eating or drinking during works and only afterwards following a change of clothing and washing.
Ensure electrical power to the pump is turned off/isolated before carrying out installation or maintenance.
A suitable first aid kit must be close to hand.
17
Delta Dual 800 Groundwater Packaged Pumping Station
DMS_IG_V800G 0123

Advertisement

Table of Contents
loading

Table of Contents