Commissioning - Proline PGH4FGL-FR Instruction Manual

Table of Contents

Advertisement

Available languages

Available languages

1. Carefully turn the hob upside down and place it on a
cushioned mat.
2. Place the bracket (B) over one of the three screw
holes in each screw hole of the underside of the hob
(as shown in the photo above: two top screw holes
+ one bottom screw hole).
3. Insert a screw (C) through the slot of the bracket (B)
into the screw hole.
Loosely tighten the screw (C) so that the bracket (B)
can still be adjusted.
4. Follow steps 2&3 to fix the other two brackets and
screws to the hob.
5. Carefully turn the hob back over and then gently
lower it into the hole that you have cut out.
6. Adjust the bracket into a position that is suitable for
your worktop.
Then fully tighten the screws to secure the hob into
position.

COMMISSIONING

When the hob has been fully installed it will be necessary to check the minimum flame
setting. To do this, follow the procedure below.
Turn the gas tap to the MAX position and ignite.
10

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PGH4FGL-FR and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents