Vega VEGABOX 03 Operating Instructions Manual page 13

Breather housing with ventilation filter
Hide thumbs Also See for VEGABOX 03:
Table of Contents

Advertisement

VEGABOX 03 •
Fig. 7: Connection steps 5 and 6
5. Insert a small screwdriver into the opening next to the terminal
and press it away from the terminal, the terminal opening will be
released.
6. Insert the wire ends into the terminals according to the wiring plan
7. Loosen the screwdriver and close the terminals again
Information:
You can find further information on the max. wire cross-section under
"Technical data/Electromechanical data"
8. Check the hold of the wires in the terminals by lightly pulling on
them
9. Connect the screen to the internal ground terminal, connect the
outer ground terminal to potential equalisation
10. Tighten the compression nut of the cable entry gland. The seal
ring must completely encircle the cable
11. Screw the housing cover back on
The connection is finished.
5 Connecting to the sensor
13

Advertisement

Table of Contents
loading

Table of Contents