Daikin LREN8A7Y1B Installer And User Manual page 109

Co2 zeas outdoor unit and capacity up unit
Hide thumbs Also See for LREN8A7Y1B:
Table of Contents

Advertisement

LREN8~12A7 + LRNUN5A7
CO₂ ZEAS outdoor unit and capacity up unit
4P704142-1 – 2022.08
1
e Wiring intake (knockout hole) for low voltage. See
out knockout
Details – DIII transmission wiring
See
"16.4 Specifications of standard wiring
Details – Remote operation switch
NOTICE
Remote operation switch. The unit is factory-equipped with an operation switch
with which you can turn unit operation ON/OFF. If you want to remotely turn ON/
OFF operation of the outdoor unit, a remote operation switch is required. Use a
voltage-free contact for microcurrent (≤1 mA, 12 V DC). Connect to X5M/1+2 class II
construction, and set to "Remote".
S1S Factory-equipped operation switch:
OFF: Unit operation turned OFF
ON: Unit operation turned ON
Remote: Unit controlled (ON/OFF) with remote operation switch
Wiring remote operation switch:
Wiring
Maximum wiring length
X1M (A1P)
X5M
4
holes" [
 106].
components" [
OFF
S1S
Only use harmonised wire providing
double insulation and suitable for the
16
Electrical installation
|
2
e
"16.3 Guidelines when knocking
4
 107].
applicable voltage.
2-cord cable
0.75~1.25 mm²
130 m
Installer and user reference guide
109

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lren10a7y1bLren12a7y1bLrnun5a7y1

Table of Contents