Initial Start-Up; Appliance Handover; Recommissioning; Settings - STIEBEL ELTRON EIL 3 Premium Operations & Installation Manual

Electronically controlled mini instantaneous water heater
Hide thumbs Also See for EIL 3 Premium:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
INSTALLATION
Commissioning
11. Commissioning

11.1 Initial start-up

f Fill the appliance for at least one minute by running the tap
several times until the pipework and appliance are free of air.
f Carry out a tightness check.
f Insert the power cable plug, if present, into the standard
safety socket or set the fuse/MCB.
f Check the appliance function.
f In the case of oversink installation, affix the company logo
supplied over the existing company logo.

11.2 Appliance handover

f Explain the appliance function to users and familiarise them
with how it works.
f Make users aware of potential dangers, especially the risk of
scalding.
f Hand over these instructions.
www.stiebel-eltron.com

11.3 Recommissioning

Property damage
!
To ensure that the bare wire heating system is not dam-
aged following an interruption to the water supply, the
appliance must be recommissioned by taking the follow-
ing steps.
f Isolate the appliance from the power supply across
all poles. Pull the power cable plug, if present, from
the socket, or remove the fuse/reset the MCB.
f Open and close the tap multiple times for at least
one minute until the appliance and the upstream
cold water supply line are free of air.
f Switch the mains power supply back on again.

11.4 Settings

You can alter the maximum flow rate and temperature.
DANGER Electrocution
The flow rate and temperature may only be adjusted if
the appliance is isolated from the power supply.
f Isolate all poles of the appliance from the power supply.