Transport And Storage - Unigas RG91 Manual

Microprocessor controlled
Table of Contents

Advertisement

MOUNTING AND CONNECTING THE BURNER

Transport and storage

ATTENTION! The equipment must be installed in compliance with the regulations in force, following the manufac-
turer's instructions, by qualified personnel. All handling operations must be carried out with appropriate
resources and qualified personnel
ATTENTION: Use intact and correctly dimensioned hoisting equipment, conforms to the local regulations and
health and safety regulations. Do not stand under lifted loads.
If the product must be stored, avoid humid and corrosive places. Observe the temperatures stated in the burner data table at the begin-
ning of this manual. The packages containing the burners must be locked inside the means of transport in such a way as to guarantee
the absence of dangerous movements and avoid any possible damage.
In case of storage, the burners must be stored inside their packaging, in storerooms protected from the weather. Avoid humid or corro-
sive places and respect the temperatures indicated in the burner data table at the beginning of this manual.
Packing
The burners are dispatched in wooden packages whose dimensions are:
series 9x: 1720 mm x 1270 mm x 1020 mm (L x P x H)
series 5xx: 1800 mm x 1500 mm x 1300 mm (L x P x H)
Packing cases of this kind are affected by humidity and are not suitable for stacking. The following are pla-
ced in each packing case.
burner;
light oil flexible hoses;
light oil filter;
gasket to be inserted between the burner and the boiler;
envelope containing this manual.
To get rid of the burner's packing, follow the procedures laid down by current laws on disposal of materials.
Fitting the burner to the boiler
To install the burner into the boiler, proceed as follows:
make a hole on the closing door of the combustion chamber as described on paragraph "Overall dimensions")
place the burner to the boiler: lift it up and handle it according to the procedure described on paragraph "Handling the burner";
place the 4 stud bolts (5), according to the burner's drilling plate described on paragraph "Overall dimensions";
fasten the 4 stud bolts;
place the ceramic fibre plait on the burner flange;
install the burner into the boiler;
fix the burner to the stud bolts, by means of the fixing nuts, according to the next picture.
After fitting the burner to the boiler, ensure that the gap between the blast tube and the refractory lining is sealed with appropriate insu-
lating material (ceramic fibre cord or refractory cement).
4
The burner is designed to work positioned according to the picture below. For different installations, please contact the Technical
PART II: INSTALLATION
6
5
4
3
2
1
6
Keys
1 Burner
2 Fixing nut
3 Washer
7
4 Ceramic fibre plait
5 Stud bolt
7 Blast tube
11
PART II: INSTALLATION
H
L
P

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rg92Rg93Rg510Rg515Rg520Rg525

Table of Contents