Nortel SRG200 Configuration Manual page 179

Communication server, main office configuration for survivable remote gateway release 1.5
Hide thumbs Also See for SRG200:
Table of Contents

Advertisement

Table 17
Provisioning details for this case (Part 2 of 2)
Region
1, 2, 3
All CDP numbers must be sufficiently long to allow unique
termination of the calls. That is, every main office/branch
office region requires its own LSC to ensure that all numbers
are unique.
1, 2, 3
Prefixes for branch offices for regular calls are required. May
have additional prefixes for E-911 calls, if required, or may
share prefixes.
1
All branch offices are provisioned at the NRS to route all calls
through the main office.
1
Main office sends all CDP calls to destinations that are not its
own branch office to the NRS with unchanged dialled digits.
1
Main office sends all CDP calls to destinations that are its own
branch office to the NRS with a specific gateway prefix in front
of the dialled digits.
1
All branch offices delete the prefix and terminate the calls.
May be to a local set or to a trunk.
2,3
Similar configuration, as above, applies to regions 2 and 3.
Main Office Configuration for SRG200/400 Release 1.5
Bandwidth Management
Provisioning detail
Page 179 of 254
Configuration Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srg4001000 con?guration guide

Table of Contents